Orange County NC Website
CITF'4F�BANL� .. , ° _ .- . . STAIVDARDSPEC�C�1TlONS`< <br /> ' WATER LINES: DETAILED SPECIFICATIONS FOR INSTALLATION <br /> ' 1. General Provisions <br /> 2. Scope of Work <br /> 3. Clearing of Rights-of-Way <br /> ' 4. Excavation for Pipelines <br /> 5. Rock Excavation in Trenches <br /> 6. Pavement Cutting and Removal <br /> ' 7. Backfilling Trenches <br /> 8. Pipe Laying -General Provisions <br /> 9. Pipelines Crossing Gravel Drives <br /> ' 10. Pipe Laying -Cast Iron Water Main <br /> 11. Pipe Laying -Ductile Iron Water Main <br /> 12. Setting Valves and Valve Boxes <br /> 13. Setting Fire Hydrants <br /> 14. Setting Ductile Iron Fittings <br /> 15. Reaction Blocking <br /> ' 16. Blowoffs <br /> 17. Testing Water Lines <br /> 18. Chlorination of Water Lines <br /> 19. Connections to Existing Water Mains <br /> 20. Pipelines Under State Highway Pavement <br /> 21. Pavement Replacement <br /> ' 22. Existing Pipes, Conduits, and Cables-Care of <br /> 23. Responsibility for Damages <br /> 24. Signs and Barricades <br /> 25. Cleanup <br /> ' 26. Erosion Control <br /> 27. Bonds and Permits Required by N.C. State Highway Commission <br /> 28. Guarantee <br /> WATER LINES: DETAILED SPECIFICATIONS FOR INSTALLATION W-1 <br /> 10/15/09 <br />