Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 4. All fire hydrants shall be Mueller Super Centurion unless otherwise <br /> noted. <br /> ' 5. All iron parts within fire hydrants shall be ductile iron. <br /> ' 6. The bury length (distance from ground line to insert of the hydrant <br /> inlet) shall be 4'-0" unless ground conditions shown on plans warrant <br /> a deeper bury. <br /> t7. The hydrant main valve shall be 4-1/2" minimum and shall be of the <br /> full compression design, opening against and closing with pressure. <br /> The valve seat ring shall thread into a bronze sub-seat, and all <br /> gaskets sealing the seat ring shall be a bronze-to-bronze surface. <br /> ' 8. Drain valves shall be all bronze and allow complete draining of all <br /> residual water in the hydrant barrel. <br /> ' 9. All bolting and fasteners below ground shall be stainless steel. <br /> ' 10. The operating machine shall utilize two (2) "O"-ring seals between <br /> the revolving nut and bronze-sheathed upper section of the valve <br /> rod. The top of the rod shall also be fitted with a travel stop nut to <br /> limit downward travel of the rod. All-weather grease shall be used to <br /> provide permanent lubrication. A thermoplastic thrust washer shall <br /> be used to reduce friction in the thrust collar while opening the <br /> ' hydrant. <br /> 11. The hydrant inlet shall be mechanical joint. Joint restraint, if <br /> ' specified, shall be accomplished for mechanical joint by use of <br /> mechanical joint gripper glands. <br /> ' D. Air Relief Valve: The air relief valve shall be rated for a working pressure of <br /> 150 psi and hydrostatic test pressure of 300 psi and shall automatically <br /> function to release to atmosphere small amounts of air that accumulate in <br /> ' the pipeline. Once the air has been exhausted, the valve shall seat tightly <br /> to prevent water leakage. <br /> ' E. Manhole Sections and Appurtenances: <br /> 1. Precast concrete manhole bases, risers and cones shall conform to <br /> ' ASTM C478, latest revision, for precast reinforced concrete manhole <br /> sections. Tapered sections and transition sections, where required, <br /> shall be of eccentric cone design, having the same wall thickness <br /> ' and reinforcement as the cylindrical ring sections. Flat slab tops <br /> shall be required for very shallow manholes and where shown or <br /> ' Rev. 10/22/01 PROJECT#13.01126 02640-Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.