Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' H. Traffic Markings: The Contractor shall repair and restripe any traffic <br /> markings that were damaged, removed- or covered during construction. <br /> ' All work shall be done in accordance with North Carolina Department of <br /> Transportation requirements and specifications. The cost of this work <br /> shall be included in the unit bid prices for other related work and no <br /> ' additional payment shall be made. <br /> I. Existing Utilities: All existing manhole and valve covers shall be raised by <br /> ' the Contractor as necessary prior to paving so that the tops of the covers <br /> are flush with the final surface. The cost of this work shall be included in <br /> the unit bid prices for other related work and no additional payment shall <br /> ' be made. <br /> 3.02 TESTING <br /> ' A. All of the above work will be subject to thickness and compaction tests as <br /> deemed necessary by the Engineer and conforming to Section 10 of the <br /> ' Superpave Hot Mix Asphalt / Quality Management System of the North <br /> Carolina Department of Transportation Pavement Construction Section. <br /> Such tests will be provided and paid for by the Owner, except that tests <br /> ' which reveal non-conformance with the Specifications and all succeeding <br /> tests for the same area, until conformance with the Specifications is <br /> established, shall be at the expense of the Contractor. The Owner will be <br /> ' responsible for paying for only the successful tests. <br /> ' END OF SECTION <br /> ' January 2014 Project#: 13.01126 02575-Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.