Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' SECTION 02575 BITUMINOUS PAVEMENT REPAIRS <br /> PART 1: GENERAL <br /> ' 1.01 SCOPE OF WORK <br /> ' A. This section covers the repairs of pavement for all asphalt surfaces. <br /> 1.02 PERFORMANCE <br /> A. Construction of the subgrade, base course, and paving shall be <br /> undertaken immediately after completion of all underground piping and <br /> ' structures, all curbs and gutters, all yard piping, all conduits and all other <br /> facilities passing beneath paved areas, and all structural slabs and <br /> foundations required within or adjacent to the paved areas. <br /> B. Weather Limitations: Bituminous mixtures shall not be produced or placed <br /> during rainy weather, when the subgrade or base course is frozen or <br /> ' shows any evidence of excess moisture, when moisture on the surface to <br /> be paved would prevent proper bond, nor when the air temperature is less <br /> than 40 degrees F° in the shade away from artificial heat. <br /> ' 1.03 REFERENCES <br /> ' A. All work and materials required under this section of the specifications <br /> shall conform to the applicable sections of the latest editions of the North <br /> Carolina Department of Transportation Division of Highways Standard <br /> ' Specifications for Roads and Structures and the North Carolina <br /> Department of Transportation Pavement Construction Section Superpave <br /> Hot Mix Asphalt/ Quality Management System. <br /> PART 2: NOT USED <br /> PART 3: EXECUTION <br /> 3.01 INSTALLATION <br /> ' A. Preparation of Subgrade: The work covered under this section of this <br /> specification shall be performed in strict accordance with Section 500 of <br /> the latest edition of the North Carolina Department of Transportation <br /> ' Division of Highways Standard Specifications for Roads and Structures. <br /> ' January 2014 Project#: 13.01126 02575-Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.