Orange County NC Website
' SECTION 02575 BITUMINOUS PAVEMENT REPAIRS <br /> PART 1: GENERAL <br /> ' 1.01 SCOPE OF WORK <br /> ' A. This section covers the repairs of pavement for all asphalt surfaces. <br /> 1.02 PERFORMANCE <br /> A. Construction of the subgrade, base course, and paving shall be <br /> undertaken immediately after completion of all underground piping and <br /> ' structures, all curbs and gutters, all yard piping, all conduits and all other <br /> facilities passing beneath paved areas, and all structural slabs and <br /> foundations required within or adjacent to the paved areas. <br /> B. Weather Limitations: Bituminous mixtures shall not be produced or placed <br /> during rainy weather, when the subgrade or base course is frozen or <br /> ' shows any evidence of excess moisture, when moisture on the surface to <br /> be paved would prevent proper bond, nor when the air temperature is less <br /> than 40 degrees F° in the shade away from artificial heat. <br /> ' 1.03 REFERENCES <br /> ' A. All work and materials required under this section of the specifications <br /> shall conform to the applicable sections of the latest editions of the North <br /> Carolina Department of Transportation Division of Highways Standard <br /> ' Specifications for Roads and Structures and the North Carolina <br /> Department of Transportation Pavement Construction Section Superpave <br /> Hot Mix Asphalt/ Quality Management System. <br /> PART 2: NOT USED <br /> PART 3: EXECUTION <br /> 3.01 INSTALLATION <br /> ' A. Preparation of Subgrade: The work covered under this section of this <br /> specification shall be performed in strict accordance with Section 500 of <br /> the latest edition of the North Carolina Department of Transportation <br /> ' Division of Highways Standard Specifications for Roads and Structures. <br /> ' January 2014 Project#: 13.01126 02575-Page 1 <br />