Orange County NC Website
' F. Prepare and maintain the Issues Log. <br /> G. Prepare and maintain completed construction checklist log. <br /> H. Witness systems, assemblies, equipment, and component startup. <br /> ' I. Compile test data, inspection reports, and certificates; include them in the <br /> systems manual and commissioning process report. <br /> PART 2 - PRODUCTS (Not Used) <br /> PART 3 - EXECUTION (Not Used) <br /> END OF SECTION 01810 <br /> t <br /> January 2014 Project# 13.01126 01810-3 <br />