Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' SECTION 01810 GENERAL COMMISSIONING REQUIREMENTS <br /> PART 1 - GENERAL <br /> ' 1.1 RELATED DOCUMENTS <br /> ' A. Drawings and general provisions of the Contract, including General and <br /> Supplementary Conditions and other Division 01 Specification Sections, apply <br /> to this Section. <br /> 1.2 SUMMARY <br /> A. Section includes general requirements that apply to implementation of <br /> commissioning without regard to specific systems, assemblies, or components. <br /> ' B. Related Sections: <br /> ' 1. Divisions 2 through 16 Sections for specific commissioning requirements <br /> for the Work in those Sections. <br /> ' 1.3 DEFINITIONS <br /> A. Commissioning Plan: A document that outlines the organization, schedule, <br /> ' allocation of resources, and documentation requirements of the commissioning <br /> process. <br /> B. CxA: Commissioning Authority— Generally the equipment manufacturer and/or <br /> ' their authorized representative. <br /> C. Systems, Subsystems, Equipment, and Components: Where these terms are <br /> ' used together or separately, they shall mean "as-built" systems, subsystems, <br /> equipment, and components. <br /> 1.4 COMMISSIONING TEAM <br /> ' A. Members Appointed by Contractor: Individuals, each having the authority to act <br /> on behalf of the entity he or she represents, explicitly organized to implement <br /> the commissioning process through coordinated action. The commissioning <br /> team shall consist of, but not be limited to, representatives of Contractor, <br /> including Project superintendent and subcontractors, installers, suppliers, and <br /> specialists deemed appropriate including the CxA. <br /> 1. CxA: The designated person, company, or entity that plans, schedules, <br /> and coordinates the commissioning team to implement the commissioning <br /> ' process. Contractor will engage the CxA under this contract. <br /> ' January 2014 Project# 13.01126 01810-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.