Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 2 - PRODUCTS ' <br /> 2.1 RECORD DRAWINGS <br /> A. Record Prints: Maintain one set of marked-up paper copies of the Contract ' <br /> Drawings and Shop Drawings. <br /> 1. Preparation: Mark record prints to show the actual installation where <br /> installation varies from that shown originally. Require individual or entity <br /> who obtained record data, whether individual or entity is Installer, <br /> subcontractor, or similar entity, to provide information for preparation of ' <br /> corresponding marked-up record prints. <br /> a. Give particular attention to information on concealed elements that <br /> would be difficult to identify or measure and record later. <br /> b. Accurately record information in an understandable drawing <br /> technique. ' <br /> C. Record data as soon as possible after obtaining it. <br /> d. Record and check the markup before enclosing concealed <br /> installations. , <br /> 2. Content: Types of items requiring marking include, but are not limited to, <br /> the following: ' <br /> a. Dimensional changes to Drawings. <br /> b. Revisions to details shown on Drawings. ' <br /> C. Depths of foundations below grade. <br /> d. Locations and depths of underground utilities. <br /> e. Revisions to routing of piping and conduits. ' <br /> f. Revisions to electrical circuitry. <br /> g. Actual equipment locations. <br /> h. Changes made by Change Order or Work Change Directive. <br /> i. Changes made following Engineer's written orders. <br /> j. Details not on the original Contract Drawings. <br /> k. Field records for variable and concealed conditions. , <br /> I. Record information on the Work that is shown only schematically. <br /> 3. Mark the Contract Drawings and Shop Drawings, whichever is most <br /> capable of showing actual physical conditions, completely and accurately. <br /> If Shop Drawings are marked, show cross-reference on the Contract <br /> Drawings. <br /> 4. Mark record sets with erasable, red-colored pencil. Use other colors to <br /> distinguish between changes for different categories of the Work at same <br /> location. <br /> 5. Mark important additional information that was either shown schematically <br /> or omitted from original Drawings. <br /> January 2014 Project#13.01126 01781-2 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.