Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Engineer. The certified copy of the list shall state that each item has been <br /> completed or otherwise resolved for acceptance. <br /> 3. Submit evidence of final, continuing insurance coverage complying with <br /> insurance requirements. <br /> 4. As necessary, submit pest-control final inspection report and warranty. <br /> ' 5. Instruct Owner's personnel in operation, adjustment, and maintenance of <br /> products, equipment, and systems. <br /> ' B. Inspection: Submit a written request for final inspection for acceptance. On <br /> receipt of request, Engineer will either proceed with inspection or notify <br /> Contractor of unfulfilled requirements. Engineer will prepare a final Certificate <br /> 1 for Payment after inspection or will notify Contractor of construction that must <br /> be completed or corrected before certificate will be issued. <br /> ' 1. Reinspection: Request reinspection when the Work identified in previous <br /> inspections as incomplete is completed or corrected. <br /> ' 1.5 LIST OF INCOMPLETE ITEMS (PUNCH LIST) <br /> A. Organization of List: Include name and identification of each space and area <br /> affected by construction operations for incomplete items and items needing <br /> correction including, if necessary, areas disturbed by Contractor that are <br /> ' outside the limits of construction. <br /> 1. Organize list of spaces in logical, sequential order. <br /> ' 2. Organize items applying to each area by major element, including <br /> categories for utilities, equipment, structures and others appropriate for <br /> the project. <br /> ' 3. Include the following information at the top of each page: <br /> a. Project name. <br /> ' b. Date. <br /> C. Name of Engineer. <br /> d. Name of Contractor. <br /> e. Page number. <br /> 4. Submit list of incomplete items in the following format: <br /> a. PDF electronic file. <br /> b. Three paper copies of product schedule or list, unless otherwise <br /> indicated. <br /> ' January 2014 Project#13.01126 01770-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.