Orange County NC Website
3. Submit specific warranties, workmanship bonds, maintenance service ' <br /> agreements, final certifications, and similar documents. <br /> 4. Obtain and submit releases permitting Owner unrestricted use of the Work ' <br /> and access to services and utilities. Include occupancy permits, operating <br /> certificates, and similar releases. <br /> 5. Prepare and submit Project Record Documents, operation and ' <br /> maintenance manuals, property surveys, and similar final record <br /> information. <br /> 6. Deliver tools, spare parts, extra materials, and similar items to location ' <br /> designated by Owner. Label with manufacturer's name and model <br /> number where applicable. <br /> 7. Make final changeover of permanent locks and deliver keys to Owner. ' <br /> Advise Owner's personnel of changeover in security provisions. <br /> 8. Complete startup testing of systems. <br /> 9. Submit test/adjust/balance records. ' <br /> 10. Terminate and remove temporary facilities from Project site, along with <br /> construction tools, and similar elements. <br /> 11. Advise Owner of changeover in heat and other utilities. ' <br /> 12. Submit changeover information related to Owner's occupancy, use, <br /> operation, and maintenance. , <br /> 13. Complete final cleaning requirements, including touchup painting. <br /> 14. Touch up and otherwise repair and restore marred exposed finishes to <br /> eliminate visual defects. ' <br /> B. Inspection: Submit a written request for inspection for Substantial Completion. <br /> Upon receipt of request, Engineer will either proceed with inspection or notify <br /> Contractor of unfulfilled requirements. Engineer will prepare the Certificate of ' <br /> Substantial Completion after inspection or will notify Contractor of items, either <br /> on Contractor's list or additional items identified by Engineer, that must be <br /> completed or corrected before certificate will be issued. <br /> 1. Reinspection: Request reinspection when the Work identified in previous <br /> inspections as incomplete is completed or corrected. ' <br /> 2. Results of completed inspection will form the basis of requirements for <br /> final completion. ' <br /> 1.4 FINAL COMPLETION <br /> A. Preliminary Procedures: Before requesting final inspection for determining final <br /> completion, complete the following: <br /> 1. Submit a final Application for Payment according to Division 01 Section , <br /> "Payment Procedures." <br /> 2. Submit certified copy of Engineer's Substantial Completion inspection list ' <br /> of items to be completed or corrected (punch list), endorsed and dated by <br /> January 2014 Project#13.01126 01770-2 ' <br />