Orange County NC Website
' MOBILIZATION <br /> SECTION 01705 <br /> 1 <br /> PART 1: GENERAL <br /> 1.01 SCOPE OF WORK <br /> A. The work covered by this section consists of preparatory work and <br /> operations, including but not limited to those necessary for the movement <br /> of personnel, equipment, supplies, and incidentals to the project site; for <br /> ' the establishment of all offices, building, and other facilities necessary for <br /> work on the project; and for all other work and operations which must be <br /> performed or costs incurred prior to beginning work on the various items <br /> ' on the project site. Included in this item will be the erection of all <br /> construction signs and signals, traffic warning devices, project sign and <br /> other preparatory signs. <br /> ' B. Mobilization payment request shall not exceed 3% of the total contract <br /> amount. <br /> ' PART 2: NOT USED <br /> PART 3: NOT USED <br /> ' END OF SECTION <br /> tJanuary 2014 Project# 13.01126 01705-1 <br />