Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01700 EXECUTION REQUIREMENTS <br /> PART I - GENERAL <br /> 1.1 RELATED DOCUMENTS <br /> A. Drawings and general provisions of the Contract, including General and <br /> Supplementary Conditions and other Division 01 Specification Sections, apply <br /> to this Section. <br /> 1.2 SUMMARY <br /> A. Section includes general administrative and procedural requirements governing <br /> execution of the Work including, but not limited to, the following: <br /> 1. Construction layout. <br /> 2. Field engineering and surveying. <br /> 3. Installation of the Work. <br /> 4. Cutting and patching. <br /> 5. Coordination of Owner-installed products, if applicable. <br /> 6. Progress cleaning. <br /> 7. Starting and adjusting. <br /> 8. Protection of installed construction. <br /> 9. Correction of the Work. <br /> B. Related Sections: <br /> 1. Division 01 Section "Submittal Procedures" for submitting surveys. <br /> 2. Division 1 Section "Project Management and Coordination" for procedures <br /> for coordinating field engineering with other construction activities. <br /> 3. Division 01 Section "Closeout Procedures" for submitting final property <br /> survey with Project Record Documents, recording of Owner-accepted <br /> deviations from indicated lines and levels, and final cleaning. <br /> 1.3 DEFINITIONS <br /> A. Cutting: Removal of in-place construction necessary to permit installation or <br /> performance of other work. <br /> B. Patching: Fitting and repair work required to restore construction to original <br /> conditions after installation of other work. <br /> January 2014 Project# 13.01126 01700-1 <br /> 1 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.