Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' C. Adjust equipment for proper operation. Adjust operating components for proper <br /> operation without binding. <br /> D. Test each piece of equipment to verify proper operation. Test and adjust <br /> controls and safeties. Replace damaged and malfunctioning controls and <br /> ' equipment. <br /> E. Manufacturer's Field Service: If a factory-authorized service representative is <br /> required to inspect field-assembled components and equipment installation, <br /> comply with qualification requirements in Division 1 Section "Quality <br /> Requirements." <br /> 3.10 PROTECTION OF INSTALLED CONSTRUCTION <br /> ' A. Provide final protection and maintain conditions that ensure installed Work is <br /> without damage or deterioration at time of Substantial Completion. <br /> ' B. Comply with manufacturer's written instructions for temperature and relative <br /> humidity. <br /> ' 3.11 CORRECTION OF THE WORK <br /> ' A. Repair or remove and replace defective construction. Restore damaged <br /> substrates and finishes. <br /> ' 1. Repairing includes replacing defective parts, refinishing damaged <br /> surfaces, touching up with matching materials, and properly adjusting <br /> operating equipment. <br /> B. Restore permanent facilities used during construction to their specified <br /> condition. <br /> C. Remove and replace damaged surfaces that are exposed to view if surfaces <br /> cannot be repaired without visible evidence of repair. <br /> D. Repair components that do not operate properly. Remove and replace <br /> operating components that cannot be repaired. <br /> E. Remove and replace chipped, scratched, and broken glass or reflective <br /> surfaces. <br /> END OF SECTION 01700 <br /> ' January 2014 Project# 13.01126 01700-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.