Orange County NC Website
' C. Adjust equipment for proper operation. Adjust operating components for proper <br /> operation without binding. <br /> D. Test each piece of equipment to verify proper operation. Test and adjust <br /> controls and safeties. Replace damaged and malfunctioning controls and <br /> ' equipment. <br /> E. Manufacturer's Field Service: If a factory-authorized service representative is <br /> required to inspect field-assembled components and equipment installation, <br /> comply with qualification requirements in Division 1 Section "Quality <br /> Requirements." <br /> 3.10 PROTECTION OF INSTALLED CONSTRUCTION <br /> ' A. Provide final protection and maintain conditions that ensure installed Work is <br /> without damage or deterioration at time of Substantial Completion. <br /> ' B. Comply with manufacturer's written instructions for temperature and relative <br /> humidity. <br /> ' 3.11 CORRECTION OF THE WORK <br /> ' A. Repair or remove and replace defective construction. Restore damaged <br /> substrates and finishes. <br /> ' 1. Repairing includes replacing defective parts, refinishing damaged <br /> surfaces, touching up with matching materials, and properly adjusting <br /> operating equipment. <br /> B. Restore permanent facilities used during construction to their specified <br /> condition. <br /> C. Remove and replace damaged surfaces that are exposed to view if surfaces <br /> cannot be repaired without visible evidence of repair. <br /> D. Repair components that do not operate properly. Remove and replace <br /> operating components that cannot be repaired. <br /> E. Remove and replace chipped, scratched, and broken glass or reflective <br /> surfaces. <br /> END OF SECTION 01700 <br /> ' January 2014 Project# 13.01126 01700-11 <br />