Orange County NC Website
B. Site: Maintain Project site free of waste materials and debris. <br /> C. Work Areas: Clean areas where work is in progress to the level of cleanliness <br /> necessary for proper execution of the Work. <br /> 1. Remove liquid spills promptly. <br /> 2. Where dust would impair proper execution of the Work, broom-clean or <br /> vacuum the entire work area, as appropriate. <br /> D. Installed Work: Keep installed work clean. Clean installed surfaces according <br /> to written instructions of manufacturer or fabricator of product installed, using <br /> only cleaning materials specifically recommended. If specific cleaning materials <br /> are not recommended, use cleaning materials that are not hazardous to health <br /> or property and that will not damage exposed surfaces. <br /> E. Concealed Spaces: Remove debris from concealed spaces before enclosing <br /> the space. <br /> F. Exposed Surfaces in Finished Areas: Clean exposed surfaces and protect as <br /> necessary to ensure freedom from damage and deterioration at time of <br /> Substantial Completion. <br /> G. Waste Disposal: Do not bury or bum waste materials on-site. Do not wash <br /> waste materials down sewers or into waterways. Comply with waste disposal <br /> requirements in Division 01 Section "Construction Waste Management'. <br /> H. During handling and installation, clean and protect construction in progress and <br /> adjoining materials already in place. Apply protective covering where required <br /> to ensure protection from damage or deterioration at Substantial Completion. <br /> I. Clean and provide maintenance on completed construction as frequently as <br /> necessary through the remainder of the construction period. Adjust and <br /> lubricate operable components to ensure operability without damaging effects. <br /> J. Limiting Exposures: Supervise construction operations to assure that no part of <br /> the construction, completed or in progress, is subject to harmful, dangerous, <br /> damaging, or otherwise deleterious exposure during the construction period. <br /> 3.9 STARTING AND ADJUSTING <br /> A. Coordinate startup and adjusting of equipment and operating components with <br /> requirements in Division 01 Section "General Commissioning Requirements." <br /> B. Start equipment and operating components to confirm proper operation. <br /> Remove malfunctioning units, replace with new units, and retest. <br /> January 2014 Project# 13.01126 01700-10 <br /> 1 0 <br />