Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
surface containing the patch. Provide additional coats until patch <br /> blends with adjacent surfaces. <br /> 4. Ceilings: Patch, repair, or rehang in-place ceilings as necessary to <br /> provide an even-plane surface of uniform appearance. <br /> 5. Exterior Building Enclosure: Patch components in a manner that restores <br /> enclosure to a weathertight condition. <br /> ' H. Cleaning: Clean areas and spaces where cutting and patching are performed. <br /> Remove paint, mortar, oils, putty, and similar materials from adjacent finished <br /> surfaces. <br /> 3.7 OWNER-INSTALLED PRODUCTS <br /> ' A. Site Access: Provide access to Project site for Owner's construction personnel, <br /> if applicable. <br /> ' B. Coordination: When required, coordinate construction and operations of the <br /> Work with work performed by Owner's construction personnel. <br /> 1. Construction Schedule: Inform Owner of Contractor's preferred <br /> construction schedule for Owner's portion of the Work. Adjust <br /> ' construction schedule based on a mutually agreeable timetable. Notify <br /> Owner if changes to schedule are required due to differences in actual <br /> construction progress. <br /> ' 2. Preinstallation Conferences: Include Owner's construction personnel at <br /> preinstallation conferences covering portions of the Work that are to <br /> receive Owner's work. Attend preinstallation conferences conducted by <br /> ' Owner's construction personnel if portions of the Work depend on Owner's <br /> construction. <br /> 3.8 PROGRESS CLEANING <br /> A. General: Clean Project site and work areas daily. Enforce requirements <br /> ' strictly. Dispose of materials lawfully. <br /> 1. Comply with requirements in NFPA 241 for removal of combustible waste <br /> ' materials and debris. <br /> 2. Do not hold waste materials more than seven days during normal weather <br /> or three days if the temperature is expected to rise above 80 degrees F. <br /> 3. Containerize hazardous and unsanitary waste materials separately from <br /> other waste. Mark containers appropriately and dispose of legally, <br /> ' according to regulations. <br /> a. Utilize containers intended for holding waste materials of type to be <br /> stored. <br /> ' January 2014 Project# 13.01126 01700-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.