Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. Attachment: Provide blocking, attachment plates, anchors and fasteners of <br /> adequate size and number to securely anchor each component in place, <br /> accurately located and aligned with other portions of the Work. Where size and <br /> type of attachments are not indicated, verify size and type required for load <br /> conditions. <br /> 1. Mounting Heights: Where mounting heights are not indicated, mount <br /> components at heights directed by Engineer. <br /> 2. Allow for structure movement, including thermal expansion and <br /> contraction. <br /> 3. Coordinate installation of anchorages. Furnish setting drawings, <br /> templates, and directions for installing anchorages, including sleeves, <br /> concrete inserts, anchor bolts, and items with integral anchors, that are to <br /> be embedded in concrete or masonry. Deliver such items to Project site in <br /> time for installation. <br /> H. Joints: Make joints of uniform width. Where joint locations in exposed work are <br /> not indicated, arrange joints for the best visual effect. Fit exposed connections <br /> together to form hairline joints. <br /> I. Hazardous Materials: Use products, cleaners, and installation materials that <br /> are not considered hazardous. <br /> 3.6 CUTTING AND PATCHING <br /> A. Cutting and Patching, General: Employ skilled workers to perform cutting and <br /> patching. Proceed with cutting and patching at the earliest feasible time, and <br /> complete without delay. <br /> 1. Cut in-place construction to provide for installation of other components or <br /> performance of other construction, and subsequently patch as required to <br /> restore surfaces to their original condition. <br /> B. Temporary Support: Provide temporary support of work to be cut. <br /> C. Protection: Protect in-place construction during cutting and patching to prevent <br /> damage. Provide protection from adverse weather conditions for portions of <br /> Project that might be exposed during cutting and patching operations. <br /> D. Adjacent Occupied Areas: Where interference with use of adjoining areas or <br /> interruption of free passage to adjoining areas is unavoidable, coordinate <br /> cutting and patching in accordance with requirements of Division 01 Section <br /> "Summary." <br /> E. Existing Utility Services and Mechanical/Electrical Systems: Where existing <br /> services/systems are required to be removed, relocated, or abandoned, bypass <br /> such services/systems before cutting to prevent interruption of services. <br /> January 2014 Project# 13.01126 01700-7 <br /> 1 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.