Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.4 SUBMITTALS ' <br /> A. Qualification Data: For professional land surveyor. ' <br /> B. Certificates: Submit certificate signed by professional land surveyor certifying <br /> that location and elevation of improvements comply with requirements. , <br /> C. Landfill Receipts: Submit copy of receipts issued by a landfill facility, licensed <br /> to accept hazardous materials, for hazardous waste disposal. ' <br /> D. Certified Surveys: Submit two (2) copies signed by professional land surveyor. <br /> 1.5 QUALITY ASSURANCE <br /> A. Land Surveyor Qualifications: A professional land surveyor who is legally ' <br /> qualified to practice in jurisdiction where Project is located and who is <br /> experienced in providing land-surveying services of the kind indicated. ' <br /> B. Cutting and Patching: Comply with requirements for and limitations on cutting <br /> and patching of construction elements. ' <br /> 1. Structural Elements: When cutting and patching structural elements, <br /> notify Engineer of locations and details of cutting and await directions from <br /> the Engineer before proceeding. Shore, brace, and support structural ' <br /> element during cutting and patching. Do not cut and patch structural <br /> elements in a manner that could change their load-carrying capacity or ' <br /> increase deflection <br /> 2. Operational Elements: Do not cut and patch operating elements and <br /> related components in a manner that results in reducing their capacity to , <br /> perform as intended or that result in increased maintenance or decreased <br /> operational life or safety. Operational elements include, but are not limited ' <br /> to the following: <br /> a. Primary operational systems and equipment. <br /> b. Fire-suppression systems. ' <br /> C. Mechanical systems piping and ducts. <br /> d. Control systems. <br /> e. Communication systems. ' <br /> f. Conveying systems. <br /> g. Electrical wiring systems. ' <br /> h. Operating systems of special construction. <br /> January 2014 Project# 13.01126 01700-2 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.