Orange County NC Website
C. Basis-of-Design Product Specification: A specification in which a specific <br /> manufacturer's product is named, including make or model number or other <br /> designation, to establish the significant qualities related to type, function, <br /> dimension, in-service performance, physical properties, appearance, and other <br /> characteristics for purposes of evaluating comparable products of additional <br /> manufacturers named in the specification. <br /> 1.4 SUBMITTALS <br /> A. Product List: Submit a list, in tabular from, showing specified products. Include <br /> generic names of products required. Include manufacturer's name and <br /> proprietary product names for each product. <br /> 1. Coordinate product list with Contractor's Construction Schedule and the <br /> Submittals Schedule. <br /> 2. Form: Tabulate information for each product under the following column <br /> headings: <br /> a. Specification Section number and title. <br /> b. Generic name used in the Contract Documents. <br /> C. Proprietary name, model number, and similar designations. <br /> d. Manufacturers name and address. <br /> e. Supplier's name and address. <br /> f. Installers name and address. <br /> g. Projected delivery date or time span of delivery period. <br /> h. Identification of items that require early submittal approval for <br /> scheduled delivery date. <br /> 3. Completed List: Within 30 days after date of commencement of the Work, <br /> submit 3 copies of completed product list. Include a written explanation <br /> for omissions of data and for variations from Contract requirements. <br /> 4. Engineers Action: Engineer will respond in writing to Contractor within 15 <br /> days of receipt of completed product list. Engineers response will include <br /> a list of unacceptable product selections and a brief explanation of <br /> reasons for this action. Engineer's response, or lack of response, does <br /> not constitute a waiver of requirement to comply with the Contract <br /> Documents. <br /> B. Substitution Requests: Submit three copies of each request for consideration. <br /> Identify product or fabrication or installation method to be replaced. Include <br /> Specification Section number and title and Drawing numbers and titles. <br /> January 2014 Project#13.01126 01600-2 <br />