Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Basis-of-Design Product Specification: A specification in which a specific <br /> manufacturer's product is named, including make or model number or other <br /> designation, to establish the significant qualities related to type, function, <br /> dimension, in-service performance, physical properties, appearance, and other <br /> characteristics for purposes of evaluating comparable products of additional <br /> manufacturers named in the specification. <br /> 1.4 SUBMITTALS <br /> A. Product List: Submit a list, in tabular from, showing specified products. Include <br /> generic names of products required. Include manufacturer's name and <br /> proprietary product names for each product. <br /> 1. Coordinate product list with Contractor's Construction Schedule and the <br /> Submittals Schedule. <br /> 2. Form: Tabulate information for each product under the following column <br /> headings: <br /> a. Specification Section number and title. <br /> b. Generic name used in the Contract Documents. <br /> C. Proprietary name, model number, and similar designations. <br /> d. Manufacturers name and address. <br /> e. Supplier's name and address. <br /> f. Installers name and address. <br /> g. Projected delivery date or time span of delivery period. <br /> h. Identification of items that require early submittal approval for <br /> scheduled delivery date. <br /> 3. Completed List: Within 30 days after date of commencement of the Work, <br /> submit 3 copies of completed product list. Include a written explanation <br /> for omissions of data and for variations from Contract requirements. <br /> 4. Engineers Action: Engineer will respond in writing to Contractor within 15 <br /> days of receipt of completed product list. Engineers response will include <br /> a list of unacceptable product selections and a brief explanation of <br /> reasons for this action. Engineer's response, or lack of response, does <br /> not constitute a waiver of requirement to comply with the Contract <br /> Documents. <br /> B. Substitution Requests: Submit three copies of each request for consideration. <br /> Identify product or fabrication or installation method to be replaced. Include <br /> Specification Section number and title and Drawing numbers and titles. <br /> January 2014 Project#13.01126 01600-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.