Orange County NC Website
' B. Asphaltic Concrete Paving: Break up and transport paving to asphalt-recycling <br /> facility. <br /> ' C. Concrete: Remove reinforcement and other metals from concrete and sort with <br /> other metals. <br /> ' 1. Pulverize concrete to maximum 1-1/2-inch size. <br /> 2. Crush concrete and screen to comply with requirements in Division 02 <br /> Section "Earthwork" for use as satisfactory soil for fill or subbase. <br /> D. Masonry: Remove metal reinforcement, anchors, and ties from masonry and <br /> sort with other metals. <br /> ' 1. Pulverize masonry to maximum 1-1/2-inch size. <br /> ' a. Crush masonry and screen to comply with requirements in <br /> Division 02 Section "Earthwork" for use as satisfactory soil for fill or <br /> subbase. <br /> ' 2. Clean and stack undamaged, whole masonry units on wood pallets. <br /> ' E. Wood Materials: Sort and stack members according to size, type, and length. <br /> Separate lumber, engineered wood products, panel products, and treated wood <br /> materials. <br /> F. Metals: Separate metals by type. <br /> ' 1. Structural Steel: Stack members according to size, type of member, and <br /> length. <br /> 2. Remove and dispose of bolts, nuts, washers, and other rough hardware. <br /> ' G. Metal Suspension System: Separate metal members including trim, and other <br /> metals from acoustical panels and tile and sort with other metals. <br /> ' H. Piping: Reduce piping to straight lengths and store by type and size. Separate <br /> supports, hangers, valves, sprinklers, and other components by type and size. <br /> I. Electrical Devices: Separate switches, receptacles, switchgear, transformers, <br /> meters, panelboards, circuit breakers, and other devices by type. <br /> J. Conduit: Reduce conduit to straight lengths and store by type and size. <br /> ' January 2014 Project#13.01126 01524-3 <br />