Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.4 SUBMITTALS <br /> A. Recycling and Processing Facility Records: Indicate receipt and acceptance of <br /> recyclable waste by recycling and processing facilities licensed to accept them. <br /> Include manifests, weight tickets, receipts, and invoices. <br /> B. Landfill and Incinerator Disposal Records: Indicate receipt and acceptance of <br /> waste by landfills and incinerator facilities licensed to accept them. Include <br /> manifests, weight tickets, receipts, and invoices, <br /> 1.5 QUALITY ASSURANCE <br /> A. Regulatory Requirements: Comply with hauling and disposal regulations of <br /> authorities having jurisdiction. <br /> PART 2 - PRODUCTS (Not Used) <br /> PART 3 - EXECUTION <br /> 3.1 PLAN IMPLEMENTATION <br /> A. General: Implement waste management plan. Provide handling, containers, <br /> storage, signage, transportation, and other items as required to implement <br /> waste management plan during the entire duration of the Contract. <br /> 1. Comply with Division 01 Section "Temporary Facilities and Controls" for <br /> operation, termination, and removal requirements. <br /> B. Site Access and Temporary Controls: Conduct waste management operations <br /> to ensure minimum interference with roads, streets, walks, walkways, and other <br /> adjacent occupied and used facilities. <br /> 1. Designate and label specific areas on Project site necessary for <br /> separating materials that are to be salvaged, recycled, reused, donated, <br /> and sold. <br /> 2. Comply with Division 01 Section "Temporary Facilities and Controls" for <br /> controlling dust and dirt, environmental protection, and noise control. <br /> 3.2 RECYCLING DEMOLITION WASTE <br /> A. Asphaltic Concrete Paving: Grind asphalt to maximum 1-1/2-inch size. <br /> 1. Crush asphaltic concrete paving and screen to comply with requirements <br /> in Division 02 Section "Earthwork" for use as general fill. <br /> January 2014 Project#13.01126 01524-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.