Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Washed Stone Undercut 611 Depth As Directed By Engineer(Bid Item No. 18) <br /> The quantity of washed, quarry stone to be paid for pipe bedding for undercut <br /> excavation will be the actual amount of material, by linear foot for each 6-inches <br /> of depth, which has been properly placed, compacted and incorporated into the <br /> completed and accepted work, as requested and approved by the Engineer. <br /> Length and depth of stone bedding installed for undercut excavation shall be <br /> verified in the field by the Engineer. <br /> The quantity of washed stone pipe bedding shall be paid for at the contract unit <br /> price per linear foot installed for each 6-inches of depth, complete including but <br /> not limited to hauling, placing, compaction, and other related construction. <br /> Placement of washed stone pipe bedding for undercut excavation shall be in <br /> accordance with the standard details. The contractor shall provide the engineer <br /> haul tickets for each load of washed stone that is utilized for undercut <br /> excavation. Only washed stone that is authorized by the Engineer and <br /> accompanied by a quarry ticket will be paid at the contract unit price under this <br /> Temporary Ditch Liner(Bid Item No. 19) <br /> The quantity of Temporary Ditch Liner to be paid for shall be the number of linear <br /> feet of temporary ditch liner properly installed and accepted. <br /> The quantity of Temporary Ditch Liner shall be paid for at the contract unit price <br /> per linear foot installed complete, including but not limited to installation, <br /> maintenance, and removal if necessary. <br /> Straw Wattle Check Dam (Bid Item No. 20) <br /> The quantity of Straw Wattle Check Dams to be paid for shall be the number of <br /> check dams properly installed and accepted. <br /> The quantity of Straw Wattle Check Dams shall be paid for at the contract unit <br /> price per check dam installed complete, including but not limited to installation, <br /> maintenance, removal and disposal of accumulated silt, and restoration of <br /> surfaces. <br /> Silt Fence Installed per Details (Bid Item No. 21) <br /> The quantity of Silt Fence to be paid for shall be the number of linear feet of silt <br /> fence properly installed and accepted. <br /> The quantity of Silt Fence shall be paid for at the contract unit price per linear <br /> foot installed complete, including but not limited to installation, maintenance, <br /> removal and disposal of accumulated silt, and final removal of silt fence and <br /> restoration of surface. <br /> Rev.4/29/14 PROJECT M.01126 01500-Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.