Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fire Hydrant Assembly with Valve and Tee (Bid Item No. 14) <br /> ' The quantity of fire hydrants to be paid will be the actual number of hydrants, <br /> complete with all appurtenances, installed and accepted. Fire hydrant locations <br /> ' are indicated on the plans. <br /> The unit price bid shall include all costs for excavation, hydrant support pads, <br /> ' materials, hydrant leg, hydrant leg gate valve, valve box, tee, backfill and <br /> compaction, restraint and thrust blocking, site restoration, and all related <br /> appurtenances as shown on the Typical Fire Hydrant Assembly Detail. Payment <br /> ' will be made at the unit price bid for the actual number and type of hydrant <br /> installed. <br /> ' Gate Valve and Box (Bid Item No. 15 and 161 <br /> ' The quantity of gate valves to be paid will be the actual number of valves, <br /> complete with all appurtenances, installed and accepted. Gate valves shall be <br /> installed as shown on the drawings. <br /> The unit price bid shall include all costs for excavation, valve support pads, <br /> materials, valve box, backfill and compaction, and site restoration. Payment will <br /> be made at the unit price bid for the actual number and type of valve installed. <br /> ' Temporary Construction Entrance (Bid Item No. 17) <br /> The quantity of Temporary Construction Entrance to be paid for shall be the <br /> number of construction entrances properly installed and accepted. <br /> The quantity of Temporary Construction Entrance shall be paid for at the <br /> ' contract unit price per entrance installed complete, including but not limited to <br /> installation, maintenance, removal and disposal of accumulated silt, and final <br /> removal of construction entrance and restoration of surface. <br /> ' Rev.4129/14 PROJECT#13.01126 01500-Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.