Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Class 350 Ductile Iron Water Line and Restrained Joint Water Line Installation <br /> (Bid Items No 10, 11, 12, 13) <br /> Measurement of the water line will be the actual number of linear feet of water <br /> line by pipe, joint, and wrap type (if any), which has been properly incorporated <br /> into the completed and accepted work. Quantities of pipe shall be verified in the <br /> field by the Engineer. Pipe length shall be measured by horizontal linear feet in <br /> place measured along the pipe center line with no deduction for fittings. <br /> The quantity of water line will be paid for at the contract unit price for each type <br /> and size of pipe as shown in the Bid Schedule. The Contractor agrees that the <br /> Owner will retain ten percent (10%) of the linear foot price for pipe included in <br /> this item until the work area has been adequately restored, and an additional ten <br /> percent (10%) of the linear foot price for pipe included in this item until the work <br /> has satisfactorily passed all required testing. Price and payment shall constitute <br /> full compensation for furnishing all equipment, tools, labor and materials to <br /> complete the work as specified, including but not limited to the following items: <br /> a. Site Preparation (including clearing and grubbing) <br /> b. Removal and Storage of Topsoil <br /> c. Location of Existing Utilities <br /> d. Common Excavation, and Trench Backfilling and Compaction <br /> e. Sheeting, Shoring, and Bracing <br /> f. Dewatering of Excavated Areas <br /> g. Waste Material Disposal <br /> h. Pipe Installation, disinfection, and Applicable Testing <br /> i. Restoration of Surfaces (including structures, landscaping, etc.) <br /> j. Grassing (Including mulch) <br /> k. Installation of temporary fencing as needed, along with repair and/or <br /> replacement of fencing. <br /> Rev.4129114 PROJECT#13.01126 01500-Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.