Class 350 Ductile Iron Water Line and Restrained Joint Water Line Installation <br /> (Bid Items No 10, 11, 12, 13) <br /> Measurement of the water line will be the actual number of linear feet of water <br /> line by pipe, joint, and wrap type (if any), which has been properly incorporated <br /> into the completed and accepted work. Quantities of pipe shall be verified in the <br /> field by the Engineer. Pipe length shall be measured by horizontal linear feet in <br /> place measured along the pipe center line with no deduction for fittings. <br /> The quantity of water line will be paid for at the contract unit price for each type <br /> and size of pipe as shown in the Bid Schedule. The Contractor agrees that the <br /> Owner will retain ten percent (10%) of the linear foot price for pipe included in <br /> this item until the work area has been adequately restored, and an additional ten <br /> percent (10%) of the linear foot price for pipe included in this item until the work <br /> has satisfactorily passed all required testing. Price and payment shall constitute <br /> full compensation for furnishing all equipment, tools, labor and materials to <br /> complete the work as specified, including but not limited to the following items: <br /> a. Site Preparation (including clearing and grubbing) <br /> b. Removal and Storage of Topsoil <br /> c. Location of Existing Utilities <br /> d. Common Excavation, and Trench Backfilling and Compaction <br /> e. Sheeting, Shoring, and Bracing <br /> f. Dewatering of Excavated Areas <br /> g. Waste Material Disposal <br /> h. Pipe Installation, disinfection, and Applicable Testing <br /> i. Restoration of Surfaces (including structures, landscaping, etc.) <br /> j. Grassing (Including mulch) <br /> k. Installation of temporary fencing as needed, along with repair and/or <br /> replacement of fencing. <br /> Rev.4129114 PROJECT#13.01126 01500-Page 6 <br />