Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Standard Manhole Installation (Bid Item No. 8) <br /> The quantity of Manholes to be paid for will be the actual number of manholes, <br /> ' complete with all appurtenances, installed and accepted. Quantities of manholes <br /> installed in accordance with the requirements of this section shall be verified in <br /> the field by the Engineer. Drop manholes and manholes constructed over <br /> existing lines will be counted separately from standard manholes. All fittings <br /> necessary for drop manholes per details shall be included in that unit price. <br /> The quantity of Manholes will be paid for at the contract unit price for each <br /> manhole, complete including but not limited to all foundation preparation, <br /> installation, backfill and compaction, concrete, pipe connections (including drop <br /> ' connections where applicable), boots, construction of invert, installation of frame <br /> and lid (watertight or standard), landscaping, testing, and all related construction <br /> to complete the work as specified. <br /> ' The Contractor agrees that the Owner will retain ten percent (10%) of the per <br /> manhole price included in this item until the work area has been adequately <br /> ' restored, and an additional ten percent (10%) of the per manhole price included <br /> in this item until the work has satisfactorily passed all required testing. Contractor <br /> further agrees that depths of manholes measured for payment shall be based on <br /> ' the construction plans prepared by the Engineer, and not post construction field <br /> conditions. Should the Contractor dispute depths shown by the Engineer, those <br /> disputes shall be submitted in writing prior to work in the area in question. All <br /> ' information gathered shall be accomplished at the sole cost of the Contractor, <br /> and no additional time will be given as a result of a successful Contractor <br /> dispute. <br /> ' Connection to Existing Manhole (Bid Item No. 9) <br /> All work covered by this section will be paid for at the contract lump sum price for <br /> the connection of the new sanitary sewer line to an existing manhole. Price and <br /> ' payment shall constitute full compensation for furnishing all equipment, tools, <br /> labor and materials to complete the work as specified, including the field location <br /> of the existing manhole, bypass pumping as required, connection of new piping <br /> ' to the existing manhole, cutting and plugging of any existing sewer connections <br /> to be abandoned, and the verification and coordination of pipe invert elevations <br /> with the Engineer. <br /> ' Rev.4129114 PROJECT#13.01126 01500-Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.