Orange County NC Website
Steel Encasement Pipe, Bored and Jacked (Bid Item No. 3 & 4) <br /> The quantity of steel encasement pipe that is installed by the boring and jacking <br /> method shall be determined by measuring the actual number of linear feet of <br /> encasement pipe by size and type with proper alignment and grade. No <br /> payment shall be made for encasement pipe that does not match the alignment <br /> and grade requirements. In addition, no payment shall be made for a failed bore <br /> attempt or excavation of a bore pit that cannot be used. <br /> The quantity of steel encasement pipe that is bored and jacked will be paid for at <br /> the contract unit price for each type, size, and thickness of pipe as shown in the <br /> bid schedule. Price and payment shall constitute full compensation for furnishing <br /> all equipment, tools, labor, and materials to complete the work as specified, <br /> including site preparation, location of existing utilities, bore pit excavation, rock <br /> excavation, installation of encasement piping, installation of bolt-on type pipe <br /> skids on carrier pipe, dewatering, shoring, placement and compaction of backfill, <br /> restoration of landscaping, and all related items necessary to complete the work <br /> as specified. Ductile iron carrier pipe and installation shall be paid for under the <br /> bid item for the applicable water pipe. No additional payment shall be made for <br /> rock encountered during the installation of the bore and lack encasement pipe. <br /> Gravel, Concrete. and Asphalt Drive/Pavement Repair(Bid Item No. 6, 6. and 7) <br /> The quantities of gravel, asphalt, and concrete drive repair are to be paid by the <br /> linear foot of material installed and included in the accepted work. The quantities <br /> for repair shall be computed based on the actual horizontal length measured in <br /> place. Thickness and width of materials shall be installed as shown on the <br /> standard details. <br /> Where pavement areas, of whatever nature have been removed by the <br /> Contractor beyond the limits called for in the plans and specifications or as set by <br /> the Owner, or have been damaged through negligence or carelessness of the <br /> Contractor's forces, they shall be replaced in accordance with these <br /> specifications at the Contractor's expense. <br /> The quantity of asphalt, concrete, and gravel repair, and the materials used for <br /> these repairs (CABC Stone, Concrete, and Asphalt) be paid at the contract unit <br /> price per linear foot. The contract price shall be full compensation for the work <br /> as specified, including but not limited to pavement cutting, hauling, tack coat, <br /> spreading, compaction, and all related construction. <br /> Rev.4/29114 PROJECT#13.01126 01500-Page 4 <br />