Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SDR 35 PVC Gravity Sewer Line Installation (item No. 2) <br /> Measurement of the sewer line will be the actual number of linear feet of sanitary <br /> sewer line by pipe type, including Class 1 washed, quarry stone embedment <br /> material, which has been properly incorporated into the completed and accepted <br /> work. Quantities of pipe shall be verified in the field by the Engineer. Pipe <br /> length shall be measured by horizontal linear feet in place measured along the <br /> pipe center line with no deduction for wyes or tees. Horizontal measurements <br /> through manholes shall be excluded. <br /> The quantity of Sanitary Sewer line will be paid for at the contract unit price for <br /> each type and size of pipe as shown in the Bid Schedule. The Contractor agrees <br /> that the Owner will retain ten percent (10%) of the linear foot price for pipe <br /> included in this item until the work area has been adequately restored, and an <br /> additional ten percent (10%) of the linear foot price for pipe included in this item <br /> until the work has satisfactorily passed all required testing. Contractor further <br /> agrees that depths of sewers measured for payment shall be based on the <br /> construction plans prepared by the Engineer, and not post construction field <br /> conditions. Should the Contractor dispute depths shown by the Engineer, those <br /> disputes shall be submitted in writing prior to work in the area in question. All <br /> information gathered shall be accomplished at the sole cost of the Contractor, <br /> and no additional time will be given as a result of a successful Contractor <br /> dispute. Price and payment shall constitute full compensation for furnishing all <br /> equipment, tools, labor and materials to complete the work as specified, <br /> including but not limited to the following items: <br /> a. Site Preparation (including clearing and grubbing) <br /> b. Removal and Storage of Topsoil <br /> c. Location of Existing Utilities <br /> d. Common Excavation, and Trench Backfilling and Compaction <br /> e. Sheeting, Shoring, and Bracing <br /> f. Dewatering of Excavated Areas <br /> g. Waste Material Disposal <br /> h. Pipe Installation and Applicable Testing <br /> i. Restoration of Surfaces (including structures, landscaping, etc.) <br /> j. Grassing (Including mulch) <br /> k. Installation of 'temporary fencing as needed, along with repair and/or <br /> replacement of fencing. <br /> I. Stone Embedment <br /> Rev.4129114 PROJECT#13.01126 01500-Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.