Orange County NC Website
PART 2: PRODUCTS <br /> 2.01 WORK ITEMS <br /> The following describes the method of measurement and payment for the <br /> bid items shown in the bid schedule. <br /> Mobilization (Item No. 1) <br /> All work covered by this section will be paid for at the contract lump sum price for <br /> "Mobilization". The lump sum bid unit price shall not exceed 3% of the total bid <br /> for the associated Division. <br /> Partial payments for the item of "Mobilization" will be made with the first, second, <br /> and third partial pay estimates paid on the contract, and will be made at the rate <br /> of 1/3 of the lump sum price for "Mobilization" on each of these partial pay <br /> estimates. <br /> Rev.4/29/14 PROJECT#13.01126 01500-Page 2 <br />