Orange County NC Website
1. Distribution: Distribute schedule to Owner, Engineer, testing agencies, ' <br /> and each party involved in performance of portions of the Work where <br /> tests and inspections are required. ' <br /> PART 2 - PRODUCTS (Not Used) ' <br /> PART 3 - EXECUTION , <br /> 3.1 TEST AND INSPECTION LOG , <br /> A. Prepare a record of tests and inspections. Include the following: <br /> 1. Date test or inspection was conducted. ' <br /> 2. Description of the Work tested or inspected. <br /> 3. Date test or inspection results were transmitted to Engineer. ' <br /> 4. Identification of testing agency or special inspector conducting test or <br /> inspection. <br /> B. Maintain log at Project site. Post changes and modifications as they occur. ' <br /> Provide access to test and inspection log for Engineer's reference during <br /> normal working hours. , <br /> 3.2 REPAIR AND PROTECTION ' <br /> A. General: On completion of testing, inspecting, sample taking, and similar <br /> services, repair damaged construction and restore substrates and finishes. ' <br /> 1. Provide materials and comply with installation requirements specified in <br /> other Specification Sections or matching existing substrates and finishes. ' <br /> Restore patched areas and extend restoration into adjoining areas with <br /> durable seams that are as invisible as possible. Comply with the Contract <br /> Document requirements for cutting and patching in Division 01 Section <br /> "Execution Requirements." <br /> B. Protect construction exposed by or for quality control service activities. , <br /> C. Repair and .protection are Contractor's responsibility, regardless of the <br /> assignment of responsibility for quality control services. ' <br /> END OF SECTION 01400 , <br /> January 2014 Project#13.01126 01400-8 <br />