Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Distribution: Distribute schedule to Owner, Engineer, testing agencies, ' <br /> and each party involved in performance of portions of the Work where <br /> tests and inspections are required. ' <br /> PART 2 - PRODUCTS (Not Used) ' <br /> PART 3 - EXECUTION , <br /> 3.1 TEST AND INSPECTION LOG , <br /> A. Prepare a record of tests and inspections. Include the following: <br /> 1. Date test or inspection was conducted. ' <br /> 2. Description of the Work tested or inspected. <br /> 3. Date test or inspection results were transmitted to Engineer. ' <br /> 4. Identification of testing agency or special inspector conducting test or <br /> inspection. <br /> B. Maintain log at Project site. Post changes and modifications as they occur. ' <br /> Provide access to test and inspection log for Engineer's reference during <br /> normal working hours. , <br /> 3.2 REPAIR AND PROTECTION ' <br /> A. General: On completion of testing, inspecting, sample taking, and similar <br /> services, repair damaged construction and restore substrates and finishes. ' <br /> 1. Provide materials and comply with installation requirements specified in <br /> other Specification Sections or matching existing substrates and finishes. ' <br /> Restore patched areas and extend restoration into adjoining areas with <br /> durable seams that are as invisible as possible. Comply with the Contract <br /> Document requirements for cutting and patching in Division 01 Section <br /> "Execution Requirements." <br /> B. Protect construction exposed by or for quality control service activities. , <br /> C. Repair and .protection are Contractor's responsibility, regardless of the <br /> assignment of responsibility for quality control services. ' <br /> END OF SECTION 01400 , <br /> January 2014 Project#13.01126 01400-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.