Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Manufacturer's Technical Representative's Field Reports: Prepare written <br /> information documenting manufacturer's technical representative's tests and <br /> inspections specified in other Sections. Include the following: <br /> 1. Name, address, and telephone number of technical representative making <br /> report. <br /> 2. Statement on field condition of substrates and their acceptability for <br /> installation of product. <br /> 3. Statement that products at Project site comply with requirements. <br /> 4. Summary of installation procedures being followed, whether they comply <br /> with requirements and, if not, what corrective action was taken. <br /> 5. Results of operational and other tests and a statement of whether <br /> observed performance complies with requirements. <br /> 6. Statement whether conditions, products, and installation will affect <br /> warranty. <br /> 7. Other required items indicated in individual Specification Sections. <br /> C. Factory-Authorized Service Representative's Reports: Prepare written <br /> information documenting manufacturer's factory-authorized service <br /> representative's tests and inspections specified in other Sections. Include the <br /> following: <br /> 1. Name, address, and telephone number of factory-authorized service <br /> representative making report. <br /> 2. Statement that equipment complies with requirements. <br /> 3. Results of operational and other tests and a statement of whether <br /> observed performance complies with requirements. <br /> 4. Statement whether conditions, products, and installation will affect <br /> warranty. <br /> 5. Other required items indicated in individual Specification Sections. <br /> D. Permits, Licenses, and Certificates: For Owner's records, submit copies of <br /> permits, licenses, certifications, inspection reports, releases, jurisdictional <br /> settlements, notices, receipts for fee payments, judgments, correspondence, <br /> records, and similar documents, established for compliance with standards and <br /> regulations bearing on performance of the Work. <br /> 1.7 QUALITY ASSURANCE <br /> A. General: Qualifications paragraphs in this article establish the minimum <br /> qualification levels required; individual Specification Sections specify additional <br /> requirements. <br /> B. Manufacturer Qualifications: A firm experienced in manufacturing products or <br /> systems similar to those indicated for this Project and with a record of <br /> successful in-service performance, as well as sufficient production capacity to <br /> produce required units. <br /> January 2014 Project#13.01126 01400-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.