Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' SECTION 01400 QUALITY REQUIREMENTS <br /> ' PART 1 - GENERAL <br /> 1.1 RELATED DOCUMENTS <br /> ' A. Drawings and general provisions of the Contract, including General and <br /> Supplementary Conditions and other Division 01 Specification Sections, apply <br /> to this Section. <br /> 1.2 SUMMARY <br /> ' A. This Section includes administrative and procedural requirements for quality <br /> assurance and quality control. <br /> ' B. Testing and inspecting services are required to verify compliance with <br /> requirements specified or indicated. These services do not relieve Contractor <br /> of responsibility for compliance with the Contract Document requirements. <br /> ' 1. Specific quality-assurance and control requirements for individual <br /> construction activities are specified in the Sections that specify those <br /> ' activities. Requirements in those Sections may also cover production of <br /> standard products. <br /> 2. Specified tests, inspections, and related actions do not limit Contractor's <br /> ' other quality assurance and control procedures that facilitate compliance <br /> with the Contract Document requirements. <br /> 3. Requirements for Contractor to provide quality-assurance and control <br /> services required by Engineer, Owner, or authorities having jurisdiction <br /> are not limited by provisions of this Section. <br /> C. Related Sections: <br /> 1. Division 01 Section "Allowances" for testing and inspecting allowances. <br /> 2. Division 01 Section "Construction Progress Documentation" for developing <br /> a schedule of required tests and inspections. <br /> 3. Divisions 02 through 16 Sections for specific test and inspection <br /> ' requirements. <br /> ' 1.3 DEFINITIONS <br /> A. Quality-Assurance Services: Activities, actions, and procedures performed <br /> ' before and during execution of the Work to guard against defects and <br /> deficiencies and substantiate that proposed construction will comply with <br /> requirements. <br /> ' January 2014 Project#13.01126 01400-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.