Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' SHOP DRAWING REVIEW <br /> ENGINEER'S REVIEW RESPONSE REQUIRED OF CONTRACTOR <br /> ❑ Furnish As Submitted,No Exceptions ❑ Confirm <br /> ' ❑ Furnish As Submitted,Make Corrections ❑ Resubmit <br /> Noted <br /> ' ❑ Not Approved(See Notes),Revise and <br /> Resubmit <br /> ❑ Not Approved,Rejected, See Notes <br /> ❑ Receipt Acknowledged(Not subject to Engineer's Review or Approval) <br /> ' The Engineer's review of this shop drawing is for general conformance with the design concept, contract <br /> documents, specifications and drawings. Markings or comments shall not be construed as relieving the <br /> ' Contractor from compliance with the project plans and specifications, nor departures there from, and does not <br /> relieve the Contractor from errors and omissions in the submittal or from the Contractor's responsibility of <br /> addressing any deviations from the contract documents, specifications and drawings. The Contractor remains <br /> ' solely responsible for details and accuracy, for confirming and correlating and verifying all quantities and <br /> dimensions at the jobsite,for selecting fabrication processes,for the means,methods,techniques,and sequence <br /> of construction, coordinating work with other trades, and performing all work in a safe manner. Engineer's <br /> ' approval shall not relieve Contractor of its obligation to perform construction in accordance with the <br /> Contract Documents. Any approval by Engineer shall not constitute an approved change or substitution <br /> unless Contractor has previously advised Engineer in writing of such proposed change or substitution and <br /> ' obtained Engineers written approval of such change or substitution <br /> McGill Associates,P.A. <br /> ' By: <br /> Date: <br /> ' END OF SECTION 01330 <br /> 1 <br /> ' May 2013 Project#13.01114 01330-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.