Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Code 5 — Receipt Acknowledged — The review indicates that the material is for <br /> information purposes only and the Engineer has taken no action as none is <br /> required. <br /> 3.3 EFFECT OF REVIEW OF CONTRACTOR'S SUBMITTALS <br /> The Engineer's review of submittal information provided by the Contractor based <br /> ' upon his review of the drawings, specifications, other project documents and <br /> proposed methods of work or information regarding materials or equipment shall <br /> not relieve the Contractor of his responsibility for errors therein and shall not be <br /> ' regarded as an assumption of risks or liability by the Owner or the Engineer, or <br /> by any officer or employee thereof, and the Contractor shall have no claim under <br /> the contract on the account of the failure, or partial failure, of the method of work, <br /> ' material, or equipment so reviewed. A mark of "No Exceptions" or "Make <br /> Corrections Noted" shall mean that the Owner has no objection to the Contractor, <br /> upon his own responsibility, using the plan or method of work proposed, or <br /> providing the materials or equipment proposed. <br /> 3.4 COSTS FOR REVIEW OF RESUBMITTALS <br /> ' The Contractor shall be completeness responsible for the of each submittal and <br /> p p <br /> identifying deviations from the project requirements. Any submittal that may <br /> irequire more than two (2) reviews by the Engineer shall be assessed a review <br /> charge of $1,000 per submittal or a fee stipulated in other sections of the project <br /> ' documents that may differ from this amount (the higher amount shall govern). <br /> This charge, covering the cost of engineering and administration, shall be <br /> assessed against progress payments. <br /> 3.5 CONTRACTOR'S APPROVAL COVER SHEET <br /> ' To be printed on a bright unique color of paper selected for this project and used <br /> to designate a Shop Drawing or Informational Submittal and permanently <br /> attached or made a part of each submittal. <br /> ' January 2014 Project#13.01126 01330-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.