Orange County NC Website
K. Maintenance Data: Comply with requirements specified in Division 01 Section <br /> "Operation and Maintenance Data." <br /> L. Design Data: Prepare and submit written and graphic information, including, <br /> but not limited to, performance and design criteria, list of applicable codes and <br /> regulations, and calculations. Include list of assumptions and other <br /> performance and design criteria and a summary of loads. Include load <br /> diagrams if applicable. Provide name and version of software, if any, used for <br /> calculations. Include page numbers. <br /> 2.2 DELEGATED-DESIGN SERVICES <br /> A. Performance and Design Criteria: Where professional design services or <br /> certifications by a design professional are specifically required of Contractor by <br /> the Contract Documents, provide products and systems complying with specific <br /> performance and design criteria indicated. <br /> B. Delegated-Design Services Certification: In addition to Shop Drawings, Product <br /> Data, and other required submittals, submit two (2) paper copies and one <br /> electronic copy in a PDF format of design documents, signed and sealed by the <br /> responsible design professional, for each product and system specifically <br /> assigned to Contractor to be designed or certified by a design professional. <br /> 1. Indicate that products and systems comply with performance and design <br /> criteria in the Contract Documents. Include list of codes, loads, design <br /> calculations and other factors used in performing these services. <br /> PART 3 . EXECUTION <br /> 3.1 CONTRACTOR'S REVIEW <br /> A. Action and Informational Submittals: Review each submittal and check for <br /> coordination with other Work of the Contract and for compliance with the <br /> Contract Documents. Note corrections and field dimensions. Mark with <br /> approval stamp before submitting to Engineer. <br /> B. Project Closeout and Maintenance/Material Submittals: Refer to requirements <br /> in Division 01 Section "Closeout Procedures." <br /> C. Approval Stamp: Stamp each submittal with a uniform, approval stamp. <br /> Include Project name and location, submittal number, Specification Section title <br /> and number, name of reviewer, date of Contractors approval, and statement <br /> certifying that submittal has been reviewed, checked, and approved for <br /> compliance with the Contract Documents. <br /> January 2014 Project#13.01126 01330-9 <br />