Orange County NC Website
' 4. Submit Product Data before or concurrent with Samples. <br /> 5. Submit Product Data in the following format: <br /> ' a. Submit one (1) paper copy and one electronic copy in a PDF format <br /> of each submittal, unless otherwise indicated. Engineer will only <br /> return one (1) electronic copy. <br /> C. Shop Drawings: Prepare Project-specific information, drawn accurately to <br /> ' scale. Do not base Shop Drawings on reproductions of the Contract <br /> Documents or standard printed data. <br /> ' 1. Preparation: Fully illustrate requirements in the Contract Documents. <br /> Include the following information, as applicable: <br /> ' a. Identification of products. <br /> b. Schedules. <br /> C. Compliance and variation with specified standards. <br /> ' d. Notation of coordination requirements. <br /> e. Notation of dimensions established by field measurement. <br /> f. Relationship and attachment to adjoining construction clearly <br /> ' indicated. <br /> g. Seal and signature of professional engineer if specified. <br /> ' 2. Sheet'Size: Except for templates, patterns, and similar full-size drawings, <br /> submit Shop Drawings on sheets at least 8-1/2 by 11 inches but no larger <br /> than 24 by 36 inches. <br /> D. Samples: Submit Samples for review of kind, color, pattern, and texture for a <br /> check of these characteristics with other elements and for a comparison of <br /> these characteristics between submittal and actual component as delivered and <br /> installed. <br /> 1. Transmit Samples that contain multiple, related components such as <br /> ' accessories together in one submittal package. <br /> 2. Identification: Attach label on unexposed side of Samples that includes <br /> the following: <br /> a. Generic description of Sample. <br /> ' b. Product name and name of manufacturer. <br /> C. Sample source. <br /> d. Number and title of applicable Specification Section. <br /> 3. Disposition: Maintain sets of approved Samples at Project site, available <br /> for quality-control comparisons throughout the course of construction <br /> activity. Sample sets may be used to determine final acceptance of <br /> ' construction associated with each set. <br /> ' January 2014 Project#13.01126 01330-7 <br />