Orange County NC Website
PART 2 - PRODUCTS ' <br /> 2.1 SUBMITTAL PROCEDURES ' <br /> A. General Submittal Procedure Requirements: Prepare and submit submittals <br /> required by individual Specification Sections. Types of submittals are indicated ' <br /> in individual Specification Sections. <br /> 1. Submittals: Submit one (1) paper copy and one electronic copy in a ' <br /> PDF format of each submittal, unless otherwise indicated. Engineer <br /> will only return one (1) electronic copy. <br /> 2. All submittals shall include a written statement from the manufacturer ' <br /> indicating that the manufacturer has reviewed the proposed application <br /> as detailed in the Contract Drawings and Specifications, and that all ' <br /> equipment, materials and systems proposed to be supplied are <br /> appropriate and compatible for this specific application. <br /> 3. All submittals shall include a cover page indicating any deviations from ' <br /> the specified requirements in the specification section, including <br /> addendum updates. t <br /> B. Product Data: Collect information into a single submittal for each element of <br /> construction and type of product or equipment. ' <br /> 1. Mark each copy of each submittal to show which products and options are <br /> applicable. ' <br /> 2. Include the following information, as applicable: <br /> a. Manufacturer's catalog cuts. ' <br /> b. Manufacturer's product specifications. <br /> C. Standard color charts. <br /> d. Statement of compliance or variations with specified referenced , <br /> standards. <br /> e. Testing by recognized testing agency. <br /> f. Application of testing agency labels and seals. , <br /> g. Notation of coordination requirements. <br /> h. Availability and delivery time information. <br /> 3. For equipment, include the following in addition to the above, as <br /> applicable: <br /> a. Wiring diagrams showing factory-installed wiring. ' <br /> b. Printed performance curves. <br /> C. Operational range diagrams. ' <br /> d. Clearances required to other construction, if not indicated on <br /> accompanying Shop Drawings. <br /> January 2014 Project#13.01126 01330-6 , <br />