Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 2 - PRODUCTS ' <br /> 2.1 SUBMITTAL PROCEDURES ' <br /> A. General Submittal Procedure Requirements: Prepare and submit submittals <br /> required by individual Specification Sections. Types of submittals are indicated ' <br /> in individual Specification Sections. <br /> 1. Submittals: Submit one (1) paper copy and one electronic copy in a ' <br /> PDF format of each submittal, unless otherwise indicated. Engineer <br /> will only return one (1) electronic copy. <br /> 2. All submittals shall include a written statement from the manufacturer ' <br /> indicating that the manufacturer has reviewed the proposed application <br /> as detailed in the Contract Drawings and Specifications, and that all ' <br /> equipment, materials and systems proposed to be supplied are <br /> appropriate and compatible for this specific application. <br /> 3. All submittals shall include a cover page indicating any deviations from ' <br /> the specified requirements in the specification section, including <br /> addendum updates. t <br /> B. Product Data: Collect information into a single submittal for each element of <br /> construction and type of product or equipment. ' <br /> 1. Mark each copy of each submittal to show which products and options are <br /> applicable. ' <br /> 2. Include the following information, as applicable: <br /> a. Manufacturer's catalog cuts. ' <br /> b. Manufacturer's product specifications. <br /> C. Standard color charts. <br /> d. Statement of compliance or variations with specified referenced , <br /> standards. <br /> e. Testing by recognized testing agency. <br /> f. Application of testing agency labels and seals. , <br /> g. Notation of coordination requirements. <br /> h. Availability and delivery time information. <br /> 3. For equipment, include the following in addition to the above, as <br /> applicable: <br /> a. Wiring diagrams showing factory-installed wiring. ' <br /> b. Printed performance curves. <br /> C. Operational range diagrams. ' <br /> d. Clearances required to other construction, if not indicated on <br /> accompanying Shop Drawings. <br /> January 2014 Project#13.01126 01330-6 , <br />
The URL can be used to link to this page
Your browser does not support the video tag.