Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1. Coordinate each submittal with fabrication, purchasing, testing, delivery, ' <br /> other submittals, and related activities that require sequential activity. <br /> 2. Submit all submittal items required for each Specification Section ' <br /> concurrently unless partial submittals for portions of the Work are <br /> indicated on approved submittal schedule. <br /> 3. Submit action submittals and informational submittals required by the ' <br /> same Specification Section as separate packages under separate <br /> transmittals. <br /> 4. Coordinate transmittal of different types of submittals for related parts of ' <br /> the Work so processing will not be delayed because of need to review <br /> submittals concurrently for coordination. <br /> 5. Engineer reserves the right to withhold action on a submittal requiring , <br /> coordination with other submittals until related submittals are received. <br /> C. Processing Time: Allow time for submittal review, including time for ' <br /> resubmittals, as follows. Time for review shall commence on Engineer's receipt <br /> of submittal. No extension of the Contract Time will be authorized because of <br /> failure to transmit submittals enough in advance of the Work to permit ' <br /> processing, including resubmittals. <br /> 1. Initial Review: Allow 21 days for initial review of each submittal. Allow , <br /> additional time if coordination with subsequent submittals is required. <br /> Engineer will advise Contractor when a submittal being processed must <br /> be delayed for coordination. ' <br /> 2. Intermediate Review: If intermediate submittal is necessary, process it in <br /> same manner as initial submittal. <br /> 3. Resubmittal Review: Allow 21 days for review of each resubmittal. ' <br /> 4. Sequential Review: Where sequential review of submittals by Engineer's <br /> consultants, Owner, or other parties is indicated, allow 21 days for initial <br /> review of each submittal. ' <br /> D. Each submittal shall be accompanied by the transmittal cover contained in this <br /> section. The cover sheet shall be printed in a bright unique color of paper (color ' <br /> selected per project) and affixed to paper copies of each submittal. The <br /> information required for each submittal is contained on the cover sheet and <br /> shall be furnished for each submittal. ' <br /> E. Submittal Identification Number: A unique four (4) character number shall be <br /> assigned by the Contractor and shall be noted on the transmittal cover sheet , <br /> accompanying each submittal. Submittal numbers shall have the following <br /> format: <br /> 1. The first character shall be a SD, W, S , or M, which represents Shop ' <br /> Drawing Data (SD), Working Drawing (W), Sample (S), or <br /> Operating/Maintenance Manual (M). ' <br /> 2. The next digits shall be the specification section number. <br /> January 2014 Project#13.01126 01330-4 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.