Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.4 SUBMITTALS SCHEDULE <br /> A. Submit a schedule of submittals, arranged in chronological order by dates <br /> required by construction schedule. Include time required for review, ordering, <br /> manufacturing, fabrication, and delivery when establishing dates. Include <br /> additional time required for making corrections or modifications to submittals <br /> noted by the Engineer and additional time for handling and reviewing submittals <br /> required by those corrections. <br /> 1. Coordinate submittal schedule with list of subcontracts, the schedule of <br /> values, and Contractors construction schedule. <br /> 2. Initial Submittal: Submit concurrently with start-up construction schedule. <br /> Include submittals required during the first 60 days of construction. List <br /> those submittals required to maintain orderly progress of the Work and <br /> those required early because of long lead time for manufacture or <br /> fabrication. <br /> 3. Final Submittal: Submit concurrently with the first complete submittal of <br /> Contractors construction schedule. <br /> a. Submit revised submittal schedule as necessary to reflect changes in <br /> current status and timing for submittals. <br /> 4. Format: Arrange the following information in a tabular format: <br /> a. Scheduled date for first submittal. <br /> b. Specification Section number and title. <br /> C. Submittal category: Action, informational. <br /> d. Name of subcontractor. <br /> e. Description of the Work covered. <br /> f. Scheduled date for Engineers final release or approval. <br /> g. Scheduled dates for purchasing. <br /> h. Scheduled dates for installation. <br /> i. Activity or event number from Construction Schedule. <br /> 1.5 SUBMITTAL ADMINISTRATIVE REQUIREMENTS <br /> A. Engineers Digital Data Files: Electronic copies of the Contract Drawings and <br /> project specifications may be provided by Engineer for Contractors use in <br /> preparing submittals only if detailed in other Sections of the Contract <br /> Documents. In cases where Engineer provides electronic copies of these <br /> documents, Engineer makes no representations as to the accuracy or <br /> completeness of digital data files as they relate to the Contract Drawings. <br /> B. Coordination: Coordinate preparation and processing of submittals with <br /> performance of construction activities. <br /> January 2014 Project#13.01126 01330-3 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.