Orange County NC Website
1 Agenda: Review and correct or approve minutes of the previous <br /> Coordination Meeting. Review other items of significance that could affect <br /> progress. Topics for discussion at these meetings will be determined as <br /> necessary based on the status of Project. <br /> 2. Contractor's Construction Schedule: Review progress since the last <br /> Coordination Meeting. Determine whether contract is on time, ahead of <br /> schedule, or behind schedule, in relation to Contractor's Construction <br /> Schedule. Determine how construction behind schedule will be expedited; <br /> secure commitments from parties involved to do so. Discuss whether <br /> schedule revisions are required to ensure that current and subsequent <br /> activities will be completed within the Contract Time. <br /> a. Schedule Updating: Revise combined Contractor's construction <br /> schedule after each coordination meeting where revisions to the <br /> schedule have been made or recognized. Issue revised schedule <br /> concurrently with report of each meeting. <br /> b. Review present and future needs of each entity present, including <br /> the following: <br /> I) Interface requirements. <br /> 2) Sequence of operations. <br /> 3) Status of submittals. <br /> 4) Deliveries. <br /> 5) Off-site fabrication. <br /> 6) Access. <br /> 7) Site utilization. <br /> 8) Temporary facilities and controls. <br /> 9) Work hours. <br /> 10) Hazards and risks. <br /> 11) Progress cleaning. <br /> 12) Quality and work standards. <br /> 13) Change Orders. <br /> 3. Reporting: Engineer shall record meeting results and distribute copies to <br /> everyone in attendance and to others affected by decisions or actions <br /> resulting from each meeting. <br /> PART 2 - PRODUCTS (Not Used) <br /> PART 3 - EXECUTION (Not Used) <br /> END OF SECTION 01310 <br /> January 2014 Project#13.01126 01310-8 <br />