r 1.5 KEY PERSONNEL <br /> ' A. Key Personnel Names: Within 15 days of the Notice to Proceed date, submit a <br /> list of key personnel assignments, including superintendent and other personnel <br /> in attendance at Project site. Identify individuals and their duties and <br /> responsibilities; list addresses and telephone numbers, including home, office, <br /> and cellular telephone numbers and email addresses. Provide names, <br /> addresses, and telephone numbers of individuals assigned as standbys in the <br /> ' absence of individuals assigned to Project. <br /> 1. Make copies of list available on site at all times for Owner's and <br /> ' Engineer's use and keep list current at all times. <br /> 1.6 COORDINATION DRAWINGS <br /> A. Coordination Drawings, General: Prepare coordination drawings in accordance <br /> with requirements in individual Sections, where installation is not completely <br /> ' shown on Shop Drawings, where limited space availability necessitates <br /> coordination, or if coordination is required to facilitate integration of products <br /> and materials fabricated or installed by more than one entity. <br /> 1. Content: Project-specific information, drawn accurately to a scale large <br /> enough to indicate and resolve conflicts. Do not base coordination <br /> drawings on standard printed data. Include the following information, as <br /> applicable: <br /> ' a. Use applicable Drawings as a basis for preparation of coordination <br /> drawings. Prepare sections, elevations, and details as needed to <br /> describe relationship of various systems and components. <br /> ' b. Coordinate the addition of trade-specific information to the <br /> coordination drawings by multiple contractors in a sequence that <br /> best provides for coordination of the information and resolution of <br /> ' conflicts between installed components before submitting for review. <br /> C. Indicate functional and spatial relationships of components of <br /> architectural, structural, civil, mechanical, and electrical systems. <br /> ' d. Indicate space requirements for routine maintenance and for <br /> anticipated replacement of components during the life of the <br /> installation. <br /> ' e. Show location and size of access doors required for access to <br /> concealed dampers, valves, and other controls. <br /> f. Indicate required installation sequences. <br /> ' g. Indicate dimensions shown on the Drawings. Specifically note <br /> dimensions that appear to be in conflict with submitted equipment <br /> and minimum clearance requirements. Provide alternate sketches to <br /> ' Engineer indicating proposed resolution of such conflicts. Minor <br /> dimension changes and difficult installations will not be considered <br /> changes to the Contract. <br /> ' January 2014 Project#13.01126 01310-3 <br />