Orange County NC Website
SECTION 01290 PAYMENT PROCEDURES <br /> PART 1 - GENERAL <br /> ' 1.1 RELATED DOCUMENTS <br /> ' A. Drawings and general provisions of the Contract, including General and <br /> Supplementary Conditions and other Division 01 Specification Sections, apply <br /> to this Section. <br /> ' 1.2 SUMMARY <br /> ' A. This Section specifies administrative and procedural requirements necessary to <br /> prepare and process Applications for Payment. <br /> ' B. Related Sections: <br /> 1. Division 01 Section "Contract Modification Procedures" for administrative <br /> procedures for handling changes to the Contract. <br /> ' 2. Division 01 Section "Construction Progress Documentation" for <br /> administrative requirements governing the preparation and submittal of the <br /> Contractor's construction schedule. <br /> ' 3. Division 01 Section "Submittal Procedures" for administrative <br /> requirements governing the preparation and submittal of the submittal <br /> schedule. <br /> 1.3 SCHEDULE OF VALUES <br /> ' A. Coordination: Coordinate preparation of the Schedule of Values with <br /> preparation of,Contractor's Construction Schedule. A cost-loaded Critical Path <br /> Method Schedule may serve to satisfy requirements for the Schedule of Values. <br /> 1. Correlate line items in the Schedule of Values with other required <br /> ' administrative forms and schedules, including the following: <br /> a. Application for Payment forms with continuation sheets. <br /> b. Submittal schedule. <br /> C. Items required to be indicated as separate activities in Contractor's <br /> Construction Schedule. <br /> 2. Submit the Schedule of Values to Engineer at earliest possible date but no <br /> later than 7 days prior to the date scheduled for submittal of the initial <br /> Applications for Payment. <br /> ' January 2014 Project#13.01126 01290-1 <br />