Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 1.7 WORK CHANGE DIRECTIVE <br /> ' A. Work Change Directive: Engineer may issue a Work Change Directive on form <br /> included in Project Manual. Work Change Directive instructs Contractor to <br /> proceed with a change in the Work, for subsequent inclusion in a Change <br /> Order. <br /> ' 1. Work Change Directive contains a complete description of change in the <br /> g P p 9 <br /> Work. It also designates method to be followed to determine change in <br /> the Contract Sum or the Contract Time. <br /> ' B. Documentation: Maintain detailed records on a time and material basis of work <br /> required by the Work Change Directive. <br /> 1. After completion of change, submit an itemized account and supporting <br /> ' data necessary to substantiate cost and time adjustments to the Contract. <br /> ' PART 2 - PRODUCTS (Not Used) <br /> ' PART 3 - EXECUTION (Not Used) <br /> END OF SECTION 01250 <br /> 1 <br /> ' January 2014 Project#13.01126 01250-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.