Orange County NC Website
SECTION 01250 CONTRACT MODIFICATION PROCEDURES <br /> PART I - GENERAL <br /> 1.1 RELATED DOCUMENTS <br /> A. Drawings and general provisions of the Contract, including General and <br /> Supplementary Conditions and other Division 01 Specification Sections, apply <br /> to this Section. <br /> 1.2 SUMMARY <br /> A. Section includes administrative and procedural requirements for handling and <br /> processing Contract modifications. <br /> B. Related Sections: <br /> 1. Division 01 Section "Product Requirements" for administrative procedures <br /> for handling requests for substitutions made after Contract award. <br /> 1.3 MINOR CHANGES IN THE WORK <br /> A. Engineer will issue supplemental instructions authorizing minor changes in the <br /> Work, not involving adjustment to the Contract Sum or the Contract Time, on <br /> form included in the Project Manual. <br /> 1.4 PROPOSAL REQUESTS <br /> A. Owner-initiated Proposal Requests: Engineer will issue a detailed description <br /> of proposed changes in the Work that may require adjustment to the Contract <br /> Sum or the Contract Time. If necessary, the description will include <br /> supplemental or revised Drawings and Specifications. <br /> 1. Proposal Requests issued by Engineer are not instructions either to stop <br /> work in progress or to execute the proposed change. <br /> 2. Within time specified in Proposal Request or 20 days, when not otherwise <br /> specified, after receipt of Proposal Request, submit a quotation estimating <br /> cost adjustments to the Contract Sum and the Contract Time necessary to <br /> execute the change. <br /> a. Include a list of quantities of products required or eliminated and unit <br /> costs, with total amount of purchases and credits to be made. If <br /> requested, furnish survey data to substantiate quantities. <br /> b. Indicate applicable taxes, delivery charges, equipment rental, and <br /> amounts of trade discounts. <br /> January 2014 Project#13.01126 01250-1 <br />