Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
only after providing temporary utility services according to requirements , <br /> indicated: <br /> 1. Notify Owner and Engineer not less than 7 days in advance of proposed ' <br /> utility interruptions. <br /> 2. Obtain Engineer's written permission before proceeding with utility <br /> interruptions. <br /> D. Noise, Vibration, and Odors: Coordinate operations that may result in high <br /> levels of noise and vibration, odors, or other disruption to Owner occupancy <br /> with Owner. <br /> 1. Notify Owner and Engineer not less than 3 days in advance of proposed r <br /> disruptive operations. <br /> 2. Obtain Engineer's written permission before proceeding with disruptive , <br /> operations. <br /> E. Nonsmoking Building: Smoking is not permitted within any building or within 25 <br /> feet of entrances, operable windows, or outdoor air intakes. ' <br /> F. Controlled Substances: Use of tobacco products and other controlled <br /> substances within any building (existing or constructed as part of this project) is ' <br /> not permitted. <br /> G. Employee Identification: Provide identification tags for Contractor personnel ' <br /> working on the Project site. Require personnel to utilize identification tags at all <br /> times. <br /> H. Employee Screening: Comply with Owner's requirements regarding drug and , <br /> background screening of Contractor personnel working on the Project site. <br /> 1. Maintain list of approved screened personnel with Owner's ' <br /> Representative. <br /> 1.10 SPECIFICATION AND DRAWING CONVENTIONS <br /> A. Specification Format: The Specifications are organized into Divisions and ' <br /> Sections using the 16-division format and CSI/CSC's "Master Format" <br /> numbering system. ' <br /> 1. Section Identification: The Specifications use Section numbers and titles <br /> to help cross-referencing in the Contract Documents. Sections in the ' <br /> Project Manual are in numeric sequence; however, the sequence is <br /> incomplete because all available Section numbers are not used. Consult <br /> the table of contents at the beginning of the Project Manual to determine ' <br /> numbers and names of Sections in the Contract Documents. <br /> January 2014 Project#13.01126 01100-4 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.