Orange County NC Website
NPDES Stormwater Dischame Permit for Construction Activities Revised August 2 2011 ' <br /> Permit Requirements(cortinued) <br /> M You must keep records of REPORTING Who inspects me for what? <br /> these inspections and any Regular Inspections are a chance DWQ coordinates with DLR's ' <br /> corrective actions taken. to check impacts to nearby Land Quality Section to ensure <br /> waters.If you observe sediment compliance with state rules and <br /> OPERATION&MAIN'f`ENANCE -that has deposited In a stream regulations governing ' <br /> You must provide the operation or wetland, you must notify the construction activities. That <br /> and maintenance necessary to Division of Water Quality means your project is subject to <br /> maintain optimal performance of regional office within 24 hours enforcement by both divisions. In <br /> stormwater controls. This means and provide written notice general, Land Quality staff will <br /> take corrective action if erosion within 5 days (see#3 on page 6 inspect your site on a regular <br /> and sediment control facilities are of the General Permit). Please basis. DWQ staff may also do <br /> not operating properlyl Operation send a copy of this inspections.The inspections may <br /> and maintenance includes, but is correspondence to the Division of be routine in nature,or,the result <br /> not limited to: Land Resources(DLR). of public complaints. <br /> a Regularly cleaning out tiON-CpMPLIANCE&FiNES DO 1 need to Submit a Notice ' <br /> sedimentation basins. Take compliance seriouslyl of intent to have coverage <br /> Stabilizing eroded bangs or Projects that violate Stormwater under this permit? <br /> spillway structures. Permit conditions and/or have No. Once your E&SC Plan is <br /> Repairing/clearing out inlets unauthorized water quality approved, your site is , <br /> and outlets. impacts are subject to fines. Civil automatically covered under this <br /> Repairing piping,seepage penalties of up to $25,000.00 permit. You do not need to <br /> and mechanical damage. per day for each violation may submit a Notice of Intent for a ' <br /> ♦ Repairing silt fence damage. be assessed. Certificate of Coverage. <br /> STtt1'R1 ��11CFpf;11A .. . .._ <br /> Site Area Description Stabilization Timefrome Exceptions <br /> Perimeter dikes,swales,ditches and slopes 7 days None <br /> 404 High Quality Water(HQW)Zones 7 days None <br /> Slopes.steeper than 3:1 7 days If slopes are 10'or less in length and are not <br /> steeper than 2:1, 14 days are allowed. <br /> (� Slopes 3:1 o(flatter 14 days 7 days for slopes greater than 50'in length. <br /> ra <br /> All other areas with slopes flatter than 4:1 14 days !None,except for perimeters and HOW Zones. <br /> Do you need more information? <br /> ` of war g4c NC Stormwater Permitting httnJ/oortal.nedenr.or-4/webAyo/ws/su <br /> 1 NCG01 Permit Information httD1/portal.ncdenr.ora/web/wNws/su/constructIon <br /> Map of Regional Offices htta://oortal.nodenr.oM&ebA yhome <br /> Still have questions?Cali the DWQ Regional Office nearest your project's location: <br /> Asheville Office (828)296-4500 Washington Office (252)946-6481 <br /> Fayetteville Office (910)433-3300 WiiminglonOffice (910)796-7215 <br /> Mooresville Office (704)663-1699 Winston-Salem Office (336)771-5000 <br /> Raleigh Office (919)791-4200 Central Office (919)807-6300 <br />