may use flanged ductile iron connections for the tee, gate valve, and air valve installation <br /> in lieu of threaded. <br /> 5. Fire Hydrants to be provided for this project shall be in accordance with Mebane <br /> Specifications page MS-7, and shall be provided with a 5-114" valve opening. Hydrants <br /> shall be American Darling,or Clow and painted to City standard color scheme. <br /> REVISIONS TO CONTRACT SPECIFICATIONS <br /> 1. Section 01500 MEASUREMENT AND PAYMENT <br /> Add the following items: <br /> 3-inch Combination Air Valve (Bid Item No. 25) <br /> The quantity of 3-inch combination air valves to be paid will be the actual number of <br /> valves, complete with all appurtenances, installed and accepted. Combination Air valves <br /> shall be installed at all high points in the water line as shown on the drawings. <br /> The unit price bid shall include all costs for the specified valve, ancillary fittings and <br /> piping, excavation, valve support pads, materials, precast concrete manhole as described <br /> in the design plans, backfill and compaction, and site restoration. Payment will be made <br /> at the unit price bid for the actual number of valves installed. <br /> 2-inch Blow Off Assembly (Bid Item No. 26) <br /> The quantity of 2-inch blow off assemblies to be paid will be the actual number installed <br /> complete with valve, and all appurtenances, installed and accepted. Blow-off assembly <br /> shall be installed as shown on the drawings. <br /> The unit price bid shall include all costs for the specified valve, ancillary fittings and <br /> piping, excavation, support pads, materials, cast iron meter box as described in the design <br /> plans, backfill and compaction, and site restoration. Payment will be made at the unit <br /> price bid for the actual number of assemblies installed. <br /> Addendum No. 2 (5/23/2014) Page 2 of 3 <br />