Orange County NC Website
Davis-Bacon Guidance for SRF Projects ATTACHMENT NO.3 <br /> To be included in the Contract Documents: <br /> ' • The entire contents of 29 CFR 5.5 <br /> • The appropriate wage rates (Usually Building or Heavy rates).This decision must be the <br /> most current and have been in effect 10 days prior to bid opening. If a wage decision for <br /> the project location is not available,then the Statewide wage determination may be <br /> ' used (attached). If it takes longer than 90 days to execute contracts and the wage rate <br /> decisions change,then the new wage rates must be incorporated into the contract. <br /> ' During Construction: <br /> • Weekly payrolls maintained onsite. Number them for each week of the construction <br /> ' period including weeks that do not have payroll. Form WH 347 is suggested. Do not <br /> submit these to the CG&L office.A certifying statement is included on the CG&L <br /> reimbursement request form. <br /> ' Link to Form WH 347-http://www.dol.gov/whd/forms/wh347.pdf <br /> • Post the appropriate wage rates <br /> ' • Post the Davis-Bacon Poster www.dol.gov/whd/regs/compliance/posters/fedproic.pdf <br /> • Conduct interviews with employees when there are irregularities concerning wages <br /> being paid. Use Standard Form 1445. (Attached) <br /> 1 <br />