Orange County NC Website
' 17.03 Cumulative Remedies <br /> A. The duties and obligations imposed by these Modified General Conditions and the rights and <br /> ' remedies available hereunder to the parties hereto are in addition to, and are not to be construed <br /> in any way as a limitation of, any rights and remedies available to any or all of them which are <br /> otherwise imposed or available by Laws or Regulations,by special warranty or guarantee, or by <br /> other provisions of the Contract Documents. The provisions of this Paragraph will be as effective <br /> as if repeated specifically in the Contract Documents in connection with each particular duty, <br /> obligation,right, and remedy to which they apply. <br /> 17.04 Survival of Obligations <br /> ' A. All representations, indemnifications, warranties, and guarantees made in, required by, or given <br /> in accordance with the Contract Documents, as well as all continuing obligations indicated in the <br /> Contract Documents, will survive final payment, completion, and acceptance of the Work or <br /> ' termination or completion of the Contract or termination of the services of Contractor. <br /> 17.05 Controlling Law <br /> A. This Contract is to be governed by the law of the state in which the Project is located. <br /> ' 17.06 Headings <br /> A. Article and paragraph headings are inserted for convenience only and do not constitute parts of <br /> these Modified General Conditions. <br /> EJCDC C-700 Modified Standard General Conditions of the Construction Contract <br /> Copyright©2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> ' Page 81 of 81 <br />