Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c. Withhold payment informing the Contractor and the Engineer of his reasons for <br /> withholding payment. <br /> D. Reduction in Payment: <br /> 1. Owner may refuse to make payment of the full amount recommended by Engineer <br /> because: <br /> a. claims have been made against Owner on account of Contractor's performance or <br /> furnishing of the Work; <br /> b. Liens have been filed in connection with the Work, except where Contractor has <br /> delivered a specific bond satisfactory to Owner to secure the satisfaction and discharge of <br /> such Liens; <br /> c. there are other items entitling Owner to a set-off against the amount recommended; or <br /> d. Owner has actual knowledge of the occurrence of any of the events enumerated in <br /> Paragraphs 14.02.B.5.a through 14.02.B.5.c or Paragraph 15.02.A. <br /> e. Failure of the Contractor to make payments due to Subcontractors, material sup-pliers, or <br /> employees. <br /> f. Damage to another Contractor or any allegations of damage caused to another Contractor <br /> g. The Owner reasonably believes that the Contractor cannot complete the Work within the <br /> Contract Price. <br /> 2. If Owner refuses to make payment of the full amount recommended by Engineer, Owner <br /> will give Contractor immediate written notice (with a copy to Engineer) stating the <br /> reasons for such action and promptly pay Contractor any amount remaining after <br /> deduction of the amount so withheld. Owner shall promptly pay Contractor the amount so <br /> withheld, or any adjustment thereto agreed to by Owner and Contractor, when Contractor <br /> remedies the reasons for such action. <br /> 3. Upon a subsequent determination that Owner's refusal of payment was not justified, the <br /> amount wrongfully withheld shall be treated as an amount due as determined by <br /> Paragraph 14.02.C.1 and subject to interest as provided in the Agreement. <br /> E. Other Payment to Contractor Provisions <br /> 1. Credit for Uncorrected Work: Should the Owner direct the Contractor to leave uncorrected <br /> Work that has been damaged or that was not performed in accordance with the Contract <br /> Documents, an equitable deduction from the Contract Amount shall be made to compensate <br /> the Owner for the Uncorrected Work. <br /> 2. Payment for Removal of Rejected Work and Materials: The removal of Work and materials <br /> rejected in accordance with paragraph 13.06.A of the Modified General Conditions and the <br /> re-execution of acceptable work by the Contractor shall be at the expense of the Contractor, <br /> and he shall pay the cost of replacing the Work of other contractors destroyed or damaged by <br /> EJCDC C-700 Modified Standard General Conditions of the Construction Contract <br /> Copyright 0 2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> Page 72 of 81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.