Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c. The consent of any surety shall be obtained to the extent required prior to payment for <br /> any materials stored off the Project site. <br /> d. Representatives of Owner and Owner's lender, if any, shall have the right to make <br /> inspections of the storage areas at any time. <br /> e. Such materials shall be: (1) protected from diversion, destruction, theft, and damage to <br /> the satisfaction of Owner and Owner's lender, if any; (2) specifically marked for use on <br /> the Project;and(3)segregated from other materials at the storage facility. <br /> B. Review of Applications: <br /> 1. Engineer will, within 10 days after receipt of each complete Application for Payment, <br /> either indicate in writing a recommendation of payment and present the Application to <br /> Owner or return the Application to Contractor indicating in writing Engineer's reasons for <br /> refusing to recommend payment. In the latter case, Contractor may make the necessary <br /> corrections and resubmit the Application. <br /> 2. Engineer's recommendation of any payment requested in an Application for Payment will <br /> constitute a representation by Engineer to Owner,based on Engineer's observations of the <br /> executed Work as an experienced and qualified design professional, and on Engineer's <br /> review of the Application for Payment and the accompanying data and schedules, that to <br /> the best of Engineer's knowledge,information and belief: <br /> a. the Work has progressed to the point indicated; <br /> b. the quality of the Work is generally in accordance with the Contract Documents (subject <br /> to an evaluation of.the Work as a functioning whole prior to or upon Substantial <br /> Completion, the results of any subsequent tests called for in the Contract Documents, a <br /> final determination of quantities and classifications for Unit Price Work under Paragraph <br /> 9.07, and any other qualifications stated in the recommendation); and <br /> c. the conditions precedent to Contractor's being entitled to such payment appear to have <br /> been fulfilled in so far as it is Engineer's responsibility to observe the Work. <br /> 3. By recommending any such payment Engineer will not thereby be deemed to have <br /> represented that: <br /> a. inspections made to check the quality or the quantity of the Work as it has been <br /> performed have been exhaustive, extended to every aspect of the Work in progress, or <br /> involved detailed inspections of the Work beyond the responsibilities specifically <br /> assigned to Engineer in the Contract Documents; or <br /> b. That Engineer is legally liable or responsible for any defects in the Work performed by <br /> the Contractor;or <br /> c. there may not be other matters or issues between the parties that might entitle Contractor <br /> to be paid additionally by Owner or entitle Owner to withhold payment to Contractor. <br /> EJCDC C-700 Modified Standard General Conditions of the Construction Contract <br /> Copyright 0 2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> Page 70 of 81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.