Orange County NC Website
2. that costs incurred in connection with tests or inspections conducted pursuant to Paragraph <br /> 13.04.13 shall be paid as provided in Paragraph 13.04.C;and <br /> 3. as otherwise specifically provided in the Contract Documents. <br /> C. If Laws or Regulations of any public body having jurisdiction require any Work(or part thereof) <br /> specifically to be inspected, tested, or approved by an employee or other representative of such <br /> public body, Contractor shall assume full responsibility for arranging and obtaining such <br /> inspections, tests, or approvals, pay all costs in connection therewith, and furnish Engineer the <br /> required certificates of inspection or approval. <br /> D. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection <br /> with any inspections, tests, or approvals required for Owner's and Engineer's acceptance of <br /> materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, <br /> or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in <br /> the Work. Such inspections,tests, or approvals shall be performed by organizations acceptable to <br /> Owner and Engineer. <br /> E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by <br /> Contractor without written concurrence of Engineer, Contractor shall, if requested by Engineer, <br /> uncover such Work for observation. <br /> F. Uncovering Work as provided in Paragraph 13.03.E shall be at Contractor's expense unless <br /> Contractor has given Engineer timely notice of Contractor's intention to cover the same and <br /> Engineer has not acted with reasonable promptness in response to such notice. <br /> G. Contractor shall be responsible for inspection of portions of the work already performed to <br /> determine that such portions are in proper condition to receive subsequent Work. Contractor <br /> shall maintain an adequate inspection system and perform such inspections as will ensure that <br /> the Work conforms strictly to the Contract requirements. Contractor shall keep full and detailed <br /> inspection records and Owner and Owner's authorized representatives shall be afforded access <br /> to, and shall be permitted to audit and copy, Contractor's inspection records relating to the <br /> Project., and Contractor shall preserve these records for a period of five years after final payment <br /> or for such longer period of time as may be required by law. <br /> 13.04 Uncovering Work <br /> A. If any Work is covered contrary to the written request of Engineer, it must, if requested by <br /> Engineer,be uncovered for Engineer's observation and replaced at Contractor's expense. <br /> B. If Engineer considers it necessary or advisable that covered Work be observed by Engineer or <br /> inspected or tested by others, Contractor, at Engineer's request, shall uncover, expose, or <br /> otherwise make available for observation, inspection, or testing as Engineer may require, that <br /> portion of the Work in question, furnishing all necessary labor,material,and equipment. <br /> C. If it is found that the uncovered Work is defective, Contractor shall pay all claims, costs, losses, <br /> and damages (including but not limited to all fees and charges of engineers, architects, attorneys, <br /> and other professionals and all court or arbitration or other dispute resolution costs) arising out of <br /> or relating to such uncovering, exposure, observation, inspection, and testing, and of satisfactory <br /> EJCDC C-700 Modified Standard General Conditions of the Construction Contract <br /> Copyright(D 2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> Page 64 of 81 <br />