Browse
Search
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements $747,840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:12:50 PM
Creation date
8/6/2014 2:06:17 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6n - Mgr signed
Amount
$747,840.00
Document Relationships
R 2014-378 Planning - J. F. Wilkerson Contracting for Morinaga America Infrastructure Improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. Standing Snow in excess of one inch(1.00") <br /> 3. Adverse Weather may include, as deemed by Engineer,"dry-out" or"mud"days: <br /> a. For rain days above the standard baseline, <br /> b. Only if there is a hindrance to site access or site work such as earthwork; and, <br /> c. At a rate no greater than one (1) make-up day for each day or consecutive days of <br /> rain beyond the standard baseline that total one inch(1.00")or more, liquid measure, <br /> unless specifically recommended otherwise by Engineer. <br /> 4. Actual adverse weather delay days must prevent work on critical exterior activities for fifty <br /> percent (50%) or more of Contractor's scheduled workday. The number of actual adverse <br /> weather delay days shall be calculated chronologically from the first to the last day of each <br /> month, and be recorded as full days. If the number of actual adverse weather days exceeds <br /> the number of days anticipated by the Standard Baseline in Paragraph 12.03.C.1, and <br /> providing that all other contractually-required conditions are met, qualifying delays will be <br /> converted to calendar days and additional calendar days will be added to the Contract times <br /> for each qualifying delay in excess of the Standard Baseline. <br /> 5. Upon commencement of on-site activities and continuing throughout construction, <br /> Contractor shall be responsible for accurately measuring and recording the daily the <br /> occurrence of adverse weather on-site. <br /> 6. Within 30 days of the last day of any month (hereinafter referred to as the "Reporting <br /> Montlf'), Contractor shall submit a written Adverse Weather Report, including copies of <br /> Contractor's daily weather reports and applicable climatological data from the National <br /> Oceanic and Atmospheric Administration (NOAA) or similar data for the project location, <br /> unless Engineer allows an additional period of time for submission of said report. <br /> Notwithstanding any other provisions, failure to submit the required written report within the <br /> time specified above shall be deemed to be and shall constitute a waiver by Contractor of any <br /> and all claims for delay due to adverse weather conditions occurring during said Reporting <br /> Month. <br /> D. Owner, Engineer, and their officers, directors, members, partners, employees, agents, <br /> consultants, or subcontractors shall not be liable to Contractor for any claims, costs, losses, or <br /> damages (including but not limited to all fees and charges of engineers, architects, attorneys, and <br /> other professionals and all court or arbitration or other dispute resolution costs) sustained by <br /> Contractor on or in connection with any other project or anticipated project. Time extensions due <br /> to weather delay shall not entitle Contractor to any claim, compensation, or recovery for <br /> extended overhead. <br /> E. Contractor shall not be entitled to an adjustment in Contract Price or Contract Times for delays <br /> within the control of Contractor. Delays attributable to and within the control of a Subcontractor <br /> or Supplier shall be deemed to be delays within the control of Contractor. <br /> F. Contractor shall be liable to Owner and shall pay Owner for a percentage of all costs incurred by <br /> Owner and Engineer in investigating, analyzing, negotiating, arbitrating, and litigating any claim <br /> EJCDC C-700 Modified Standard General Conditions of the Construction Contract <br /> Copyright 0 2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> Page 62 of 81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.